BLD-Final | 12/2/2016 | 12/2/2016 | 12/2/2016 | P | NR |
Jim Sly
|
|
|
Shawn-this permit was never finaled out Phone #: ###-#### Told Shawn to get Electrical final.
|
BLD-Energy code compliance | 2/17/2006 | 2/21/2006 | 2/21/2006 | A | PASS |
Jim Sly
|
|
|
Perry; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Framing/Rough-in | 2/15/2006 | 2/15/2006 | 2/15/2006 | P | PASS |
Jim Sly
|
|
|
Perry; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|