BLD-Final | 2/23/2006 | 2/23/2006 | 2/23/2006 | P | PASS |
Jim Sly
|
|
|
Darin; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong C/C issued
|
FIRE-Final Inspection | 2/21/2006 | 2/23/2006 | 2/23/2006 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
DOC - Permit Finaled | 2/23/2006 | 2/20/2006 | 2/20/2006 | P | PASS |
Jim Sly
|
|
|
|
BLD-Other | 2/14/2006 | 2/15/2006 | 2/15/2006 | A | PASS |
Jim Sly
|
|
|
ceiling grid inspection///darren; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 2/3/2006 | 2/6/2006 | 2/6/2006 | A | PART |
Mike Jordan
|
|
|
Darren -- for ceiling grid insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Grid in place is floating, plans show fixed. In place system is ok, but contractor needs to follow with approval from architect of work in place.
|
BLD-Framing/Rough-in | 1/24/2006 | 1/25/2006 | 1/25/2006 | A | PASS |
Jim Sly
|
|
|
Darren -- call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Framing/Rough-in | 1/12/2006 | 1/13/2006 | 1/13/2006 | A | PART |
Jim Sly
|
|
|
darren; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa N. 1/2 of construction area OK for Frame..... Waiting for Re-submittal for S. 1/2
|