BLD-Final | 6/20/2006 | 6/21/2006 | 6/21/2006 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/20/2006 at 3:20:05 PM. Contact: ###-####.
|
DOC - Permit Finaled | 6/21/2006 | 6/21/2006 | 6/21/2006 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 6/13/2006 | 6/14/2006 | 6/14/2006 | A | PASS |
Forrest France
|
|
|
Correction notice items have been completed. NOTE: per contractor one PFE to be installed on the wall in the workroom today as discussed.
|
FIRE-Final Inspection | 5/25/2006 | 5/26/2006 | 5/26/2006 | A | FAIL |
Forrest France
|
|
|
Door assembly at the 2-hour rated exit enclosure does not meet requirements, door from the workroom to the gift shop needs adjustment, HVAC register is completely blocked by a wooden cabinet, notified contractor the approved plans and review comments are to be available at the next inspection.
|
BLD-Aging Inspection | 5/17/2006 | 5/17/2006 | 5/18/2006 | | PASS |
Dave Hannah
|
|
|
|