FIRE-Final Inspection | 8/21/2007 | 8/22/2007 | 8/22/2007 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. The duct smoke detectors operated correctly.
|
BLD-Final | 8/16/2007 | 8/17/2007 | 8/17/2007 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 8/16/2007 at 10:16:39 AM. Contact: ###-####. ok for temp occ. Will be ok for perm occ once others perm.
|
FIRE-Final Inspection | 8/16/2007 | 8/16/2007 | 8/16/2007 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until the gas meter has been set and the duct smoke detectors can be tested. A condition of the temporary is that the hvac units not be used. I witnessed the power supply to both units being disabled.
|
Code Occupancy Approval | | | 8/15/2007 | | PASS |
|
|
|
OK FOR FINAL.
|
BLD-Other | 8/14/2007 | 8/14/2007 | 8/14/2007 | P | CANC |
Mike Jordan
|
|
|
Jake; safety inspection; Phone #: ###-#### Internet Inspection Request from: Hattie James
|
FIRE-Final Inspection | 8/14/2007 | 8/15/2007 | 8/14/2007 | A | FAIL |
Troy Cobbley
|
|
|
See the front page of the city approved building plans for the items that need corrected. These items include door hardware, repair exit signs/emergency lights, remote annunciators and sample tubes for the duct smoke detectors and fire dept access signage.
|
BLD-Conference | 7/17/2007 | 7/17/2007 | 7/17/2007 | A | DONE |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 7/17/2007 at 6:50:24 AM.
|
BLD-Other | 4/22/2007 | 4/23/2007 | 4/23/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/22/2007 at 3:11:18 PM. Inspected remainder of 5/8 type x at 1hr. stair enclosure.
|
BLD-Energy code compliance | 4/17/2007 | 4/17/2007 | 4/17/2007 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/17/2007 at 7:41:30 AM.
|
BLD-Energy code compliance | 4/15/2007 | 4/16/2007 | 4/16/2007 | A | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/15/2007 at 5:34:41 PM. work not completed or started.
|
BLD-Framing/Rough-in | 4/11/2007 | 4/12/2007 | 4/12/2007 | P | FAIL |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/11/2007 at 3:51:41 PM. Contact: ###-####. Finish nailing off all hangars, fireblock mech shaft at ceiling line, More nailing and fire caulking required at 1hr exit enclosure.
|
BLD-Conference | 3/19/2007 | 3/19/2007 | 3/19/2007 | P | CANC |
Mike Jordan
|
|
|
jake - have questions and possible inspection ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. ok to rock floor joist to hang mech ducts.
|
BLD-Other | 3/1/2007 | 3/1/2007 | 3/1/2007 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/1/2007 at 8:24:38 AM.
|
Extend Permit 180 days | | 7/14/2006 | | | |
|
|
|
per rita deyoung ok to extend permits bld05-03468 & bld05-03469 while randy callies gets with the bank for financing
|