BLD-Final | 3/21/2008 | 3/21/2008 | 3/21/2008 | P | PASS |
Dave Hannah
|
|
|
Mel; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok for perm occ
|
BLD-Final | 3/17/2008 | 3/18/2008 | 3/18/2008 | A | PART |
Dave Hannah
|
|
|
mel Phone #: ###-#### everything ok but for ada unit needs removable counter at kitchen sink
|
FIRE-Final Inspection | 3/14/2008 | 3/17/2008 | 3/17/2008 | A | PASS |
Forrest France
|
|
|
items on correction notice are complete, door closures adjacent to the common corridor to be adjusted prior to structural final as discussed.
|
FIRE-Final Inspection | 3/12/2008 | 3/13/2008 | 3/13/2008 | A | FAIL |
Forrest France
|
|
|
Provide fire dept. access lane marking per fire code review notes, noted painted and covered fire sprinkler heads at various locations to be replaced prior to final.
|
FIRE-Final Inspection | 3/10/2008 | 3/10/2008 | 3/11/2008 | P | NR |
Forrest France
|
|
|
Final pending completed fire alarm and fire sprinkler permit work.
|
BLD-Energy code compliance | 9/11/2007 | 9/11/2007 | 9/12/2007 | P | PASS |
Dave Hannah
|
|
|
mel; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt ok to cover
|
BLD-Energy code compliance | 9/10/2007 | 9/10/2007 | 9/11/2007 | P | FAIL |
Dave Hannah
|
|
|
mel Phone #: ###-#### needs to insulate rim
|
BLD-Framing/Rough-in | 8/30/2007 | 8/31/2007 | 8/31/2007 | A | PASS |
Dave Hannah
|
|
|
Mel; Phone #: ###-#### Internet Inspection Request from: Hattie James ok to insulate
|
BLD-Framing/Rough-in | 8/21/2007 | 8/22/2007 | 8/22/2007 | A | FAIL |
Dave Hannah
|
|
|
mel Phone #: ###-#### needs seal package installed needs to fire stop party walls finish shear nailing and shaft
|
BLD-Framing/Rough-in | 4/11/2007 | 4/12/2007 | 4/12/2007 | A | PASS |
Dave Hannah
|
|
|
sheer wall Mel; Phone #: ###-#### Internet Inspection Request from: Stacie Backus ok to cover ext walls
|
BLD-Framing/Rough-in | 4/10/2007 | 4/11/2007 | 4/10/2007 | A | CANC |
Dave Hannah
|
|
|
mel; Phone #: ###-#### Internet Inspection Request from: Patricia Smith Inspection cancelled from web by: Victoria Beall
|
BLD-Other | 4/9/2007 | 4/10/2007 | 4/10/2007 | A | CANC |
Dave Hannah
|
|
|
MEL - SHEAR; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Foundation | 3/6/2007 | 3/7/2007 | 3/7/2007 | A | PART |
Dave Hannah
|
|
|
harvey ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith columns ok to pour
|
BLD-Footing | 2/27/2007 | 2/28/2007 | 2/28/2007 | A | PART |
Dave Hannah
|
|
|
harvey ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith colunm ftgs ok to pour
|
BLD-Foundation | 1/22/2007 | 1/24/2007 | 1/24/2007 | A | PASS |
Dave Hannah
|
|
|
harvey; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Foundation | 1/22/2007 | 1/23/2007 | 1/22/2007 | A | CANC |
Jim Sly
|
|
|
harvey; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Inspection cancelled from web by: Victoria Beall
|
BLD-Footing | 1/16/2007 | 1/17/2007 | 1/17/2007 | A | PASS |
Jim Sly
|
|
|
harvey - rebar; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Verified U-FER ground Min 20'
|
BLD-Footing | 1/16/2007 | 1/17/2007 | 1/17/2007 | A | CANC |
Jim Sly
|
|
|
Harvey; Phone #: ###-####
|
BLD-Footing | 1/12/2007 | 1/16/2007 | 1/16/2007 | A | NR |
Tony Young
|
|
|
harvey; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|