BLD-Final | 4/18/2006 | 4/19/2006 | 4/20/2006 | P | FAIL |
Dave Hannah
|
|
|
renea; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs to install doors and hardware
|
FIRE-Final Inspection | 4/18/2006 | 4/19/2006 | 4/19/2006 | A | PASS |
Forrest France
|
|
|
Fire life safety is acceptable pending installation of lever hardware at two door locations.
|
BLD-Final | 4/10/2006 | 4/11/2006 | 4/11/2006 | A | FAIL |
Dave Hannah
|
|
|
renea; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs fire sign off
|
FIRE-Final Inspection | 4/10/2006 | 4/10/2006 | 4/10/2006 | P | FAIL |
Forrest France
|
|
|
Max occupant load sign is not yet posted, approved plans and sign off card not available on site.
|
BLD-Final | 4/3/2006 | 4/3/2006 | 4/4/2006 | P | CANC |
Dave Hannah
|
|
|
-- ###-####-- renee--pending fire fn & ele
|
FIRE-Final Inspection | 4/3/2006 | 4/3/2006 | 4/3/2006 | P | NR |
Forrest France
|
|
|
Door hardware at two locations is not installed yet, missing fire sprinkler escutcheon at closet, need to post max. occupant load sign as discussed, ceiling tile is not installed at relocated heads.
|
BLD-Framing/Rough-in | 3/23/2006 | 3/24/2006 | 3/24/2006 | A | PASS |
Tom Arcoraci
|
|
|
renea; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
FIRE-Conference | 2/16/2006 | 2/17/2006 | 2/17/2006 | A | DONE |
Forrest France
|
|
|
On site confrence to discuss construction modifications that may affect fire sprinkler coverage. Two locations at the west side will require changes in sprinkler coverage to avoid "cold solder" of heads that are now located too close together due to wall removal. A fire sprinkler permit is necessary to perform this work.
|
BLD-Framing/Rough-in | 2/14/2006 | 2/14/2006 | 2/15/2006 | P | PASS |
Dave Hannah
|
|
|
RENE; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|