Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-00088
StatusFinaled
Name MUTUAL BENEFIT RESIDENCE
Site Address 420 W MAIN ST Unit: 404
Project NameVELTEX BLDG-4TH/5TH FLRS
Customer Number 
ePlanReviewNo
Description
(MUTUAL BENEFIT RESIDENCE - VELTEX BLDG - STE 404) This building is fire sprinklered for story increase. To complete a 2 story residential condominium located on the 4th and 5th stories of the Veltex Building. This unit will have a 2,050 square foot main level (includes the 451 square foot exterior terrace and the 160 square foot exterior terrace) and a 1,050 square foot 2nd level. The total floor area of this tenant space will be about 3,100 square feet. Work is to include interior nonbearing walls, an interior spiral stairway, interior guards, interior doors, a gas fireplace, and interior finishes. The entire main level is required to comply as a "Type B" dwelling unit. The work is required to comply with the approved drawings, the plan review report, and with all applicable codes. The fire sprinkler system shall be maintained in compliance with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/23/20071/24/20071/24/2007APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/23/2007 at 6:28:03 AM. Contact: ###-####. ok for perm occ
BLD-Final1/23/20071/23/20071/23/2007ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/23/2007 at 6:28:03 AM. Contact: ###-####. per 425
BLD-Final1/22/20071/22/20071/22/2007AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/22/2007 at 6:24:21 AM. Contact: ###-####.stair risers
BLD-Final1/12/20071/12/20071/12/2007ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/12/2007 at 6:13:53 AM. Contact: ###-####.
BLD-Final1/12/20071/12/20071/12/2007PFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/12/2007 at 6:13:53 AM. Contact: ###-####.stairs out of code
FIRE-Final Inspection1/5/20071/5/20071/5/2007APASS
DetailsForrest France
Final fire life safety inspection passed, one missing 2nd pc. 401 escutcheon at the SW below the stairs to be installed today.
BLD-Framing/Rough-in8/16/20068/17/20068/17/2006PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/16/2006 at 2:55:42 PM. Contact: ###-####. ok to cover
BLD-Framing/Rough-in8/11/20068/14/20068/14/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/11/2006 at 12:48:26 PM. Contact: ###-####. ok to insulate needs to patch fire proofing on beams
BLD-Conference6/23/20066/26/20066/26/2006APASS
DetailsDave Hannah
meet dixie and carl at 9:00 Please
BLD-Aging Inspection6/15/20066/15/20066/21/2006 PASS
DetailsDave Hannah