BLD-Final | 11/1/2006 | 11/1/2006 | 11/1/2006 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/1/2006 at 9:04:05 AM. Contact: ###-####. C/C issued
|
DOC - Permit Finaled | 11/1/2006 | 11/1/2006 | 11/1/2006 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 10/30/2006 | 10/31/2006 | 10/31/2006 | A | PASS |
Forrest France
|
|
|
Life safety inspection for the shell building passed.
|
BLD-Energy code compliance | 8/3/2006 | 8/4/2006 | 8/4/2006 | A | PASS |
Jim Sly
|
|
|
rob ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Framing/Rough-in | 7/28/2006 | 7/31/2006 | 7/31/2006 | P | PASS |
Mike Jordan
|
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. ok to insul. pending elec.
|
BLD-Framing/Rough-in | 7/19/2006 | 7/20/2006 | 7/20/2006 | A | DONE |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/19/2006 at 8:55:58 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 7/12/2006 | 7/13/2006 | 7/13/2006 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 7/12/2006 at 11:38:06 AM. Contact: ###-####. Shear nailing on exterior peremeter walls.
|
BLD-Foundation | 5/17/2006 | 5/19/2006 | 5/19/2006 | A | PASS |
Jim Sly
|
|
|
Jack, late a.m; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD-Footing | 5/17/2006 | 5/18/2006 | 5/18/2006 | A | PART |
Jim Sly
|
|
|
Jack, call if problem; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt Footing for CMU screen wall and trash encl
|
BLD-Foundation | 5/11/2006 | 5/12/2006 | 5/12/2006 | P | PASS |
Jim Sly
|
|
|
late as possible//jack; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Footing | 5/8/2006 | 5/9/2006 | 5/9/2006 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/8/2006 at 12:10:19 PM. Contact: ###-####. No special insp req. Design 2500 psi
|