Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-00314
StatusFinaled
Name BARCLAY CONSTRUCTION
Site Address 1012 E MCKINLEY ST
Project Name 
Customer Number 
ePlanReviewNo
Description
"NO CONTRACTOR REGISTRATION PROVIDED. APPLICANT CERTIFIES EXEMPTION PER IDAHO STATUTE 54-5205". To construct a three bedroom, three bathroom, 1794 sq.ft. two story townhouse on a zero lot line (967sq.ft. first floor / 828sq.ft. Upper floor) with a 40sq.ft. covered first floor porch, a 35sq.ft. covered first floor rear patio, a 38sq.ft. covered second floor balcony, and a 480sq.ft. detached garage per approved plans, all red-lining, and plan review report. THE CONSTRUCTION OF THE DWELLING UNIT SEPERATION WALLS IS DESIGNED TO MEET TOWNHOUSE CONSTRUCTION. CAA05-00282, R-2 zoning, and setbacks as per Susan Riggs with Planning and Zoning. (SRZ)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/15/200611/15/200611/15/2006PPASS
DetailsDave Hannah
Access to the house is the same. Call Janet ###-#### w/any questions. ; Phone #: ###-#### Internet Inspection Request from: JANET TATILIAN
DOC - Permit Finaled11/15/200611/15/200611/15/2006PPASS
DetailsDave Hannah
BLD-Final11/10/200611/13/200611/14/2006PFAIL
DetailsDave Hannah
Call Janet ###-#### for access to house; Phone #: ###-#### Internet Inspection Request from: JANET TATILIAN needs landing outside of man door of garage ,needs headroom on stairs and zoning final
BLD-Other11/13/200611/14/200611/14/2006PCANC
DetailsDave Hannah
per Dave Hannah, we are suppose to have planning and zoning sign off on this before final inspection; Phone #: ###-#### Internet Inspection Request from: JANET TATILIAN - per david hannan on 11/14/06
BLD-Final11/9/200611/9/200611/9/2006PCANC
DetailsDave Hannah
Please call Janet ###-#### for access to house; Phone #: ###-#### Internet Inspection Request from: JANET TATILIAN Inspection cancelled from web by: JANET TATILIAN
BLD-Framing/Rough-in8/22/20068/23/20068/23/2006APASS
DetailsDave Hannah
ROB nOTE: DETACHED GARAGE; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Energy code compliance7/25/20067/26/20067/26/2006PPASS
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: JANET TATILIAN
BLD-Framing/Rough-in7/20/20067/21/20067/21/2006APASS
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: JANET TATILIAN
BLD-Footing3/22/20063/23/20063/23/2006PPART
DetailsDave Hannah
Santos -- prefer 3:00 PM; call 1st before inspection; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong ok to pour house ftgs