DOC - Permit Finaled | | | 12/11/2006 | | DONE |
|
|
|
Building passed inspection
|
BLD-Final | 11/28/2006 | 11/28/2006 | 11/28/2006 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/28/2006 at 9:22:03 AM. Contact: ###-####. final ok pending p&z
|
BLD-Final | 11/21/2006 | 11/22/2006 | 11/22/2006 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/21/2006 at 4:04:36 PM. Contact: ###-####. need landing at exterior doors. need others to sign off.
|
FIRE-Final Inspection | 11/21/2006 | 11/22/2006 | 11/22/2006 | A | PASS |
Forrest France
|
|
|
Building 5 life safety passed, the adjacent hydrant on the north side of the building to be rotated 45 deg. as discussed for proper access prior to final for building 4.
|
BLD-Aging Inspection | 11/20/2006 | 11/20/2006 | 11/20/2006 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Energy code compliance | 9/15/2006 | 9/18/2006 | 9/18/2006 | A | PART |
Jim Storey
|
|
|
brandon; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley gyp assembly being instaled coretly and fire stopping in progess 3hr assembly ok
|
BLD-Framing/Rough-in | 9/15/2006 | 9/18/2006 | 9/18/2006 | A | CANC |
Jim Storey
|
|
|
requested wrong insp per brandon; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Conference | 8/9/2006 | 8/9/2006 | 8/9/2006 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/9/2006 at 8:46:02 AM. Contact: ###-####.need letter for girt to overhead door atchment/ need 3 hr control joint.
|