BLD-Final | 10/9/2006 | 10/10/2006 | 10/10/2006 | A | PASS |
Mike Jordan
|
|
|
Val, please call 1st; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. ok for perm occ.
|
Permanent Occupancy | | 10/10/2006 | 10/10/2006 | | DONE |
|
|
|
|
FIRE-Final Inspection | 7/17/2006 | 7/18/2006 | 7/18/2006 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
BLD-Final | 7/18/2006 | 7/18/2006 | 7/18/2006 | A | PART |
Mike Jordan
|
|
|
Val. Temp cc granted. Needs to insulate attic space and install permanant landing out backdoor. Also needs to instal tempered glass in two locations. existing glass has been removed.
|
BLD-Energy code compliance | 7/17/2006 | 7/18/2006 | 7/18/2006 | A | CANC |
Mike Jordan
|
|
|
val; Phone #: ###-#### Internet Inspection Request from: Letitia Gallop
|
BLD-Energy code compliance | 7/14/2006 | 7/17/2006 | 7/17/2006 | A | CANC |
Tony Young
|
|
|
val; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
FIRE-Final Inspection | 7/14/2006 | 7/17/2006 | 7/17/2006 | A | FAIL |
Troy Cobbley
|
|
|
Provide drawings/notes for the shell permit BLD06-00379so that it can be finaled. Provide landings at the exits. Repair exit signs and provide emergency lighting as per the approved plans.
|
BLD-Final | 7/14/2006 | 7/17/2006 | 7/17/2006 | P | CANC |
Mike Jordan
|
|
|
###-####- val ///cancelled per Val not ready 7/17/06 LEG 1:41pm
|
BLD-Conference | 7/12/2006 | 7/12/2006 | 7/12/2006 | P | DONE |
Mike Jordan
|
|
|
val; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
FIRE-Conference | 6/30/2006 | 7/3/2006 | 7/3/2006 | A | DONE |
Forrest France
|
|
|
On site visit to discuss fire extinguisher locations and requirements of fire code review notes.
|
BLD-Conference | 6/30/2006 | 7/3/2006 | 7/3/2006 | A | DONE |
Mike Jordan
|
|
|
val; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 6/1/2006 | 6/2/2006 | 6/2/2006 | A | PASS |
Mike Jordan
|
|
|
val; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|