BLD-Final | 8/16/2006 | 8/17/2006 | 8/17/2006 | A | PASS |
Dave Hannah
|
|
|
Chris; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok for perm occ
|
Permanent Occupancy | | 8/17/2006 | 8/17/2006 | | DONE |
|
|
|
|
BLD-Final | 7/13/2006 | 7/17/2006 | 7/17/2006 | A | PART |
Dave Hannah
|
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok for temp occ needs to fix ada restroom mens only
|
BLD-Energy code compliance | 7/13/2006 | 7/14/2006 | 7/14/2006 | P | CANC |
Dave Hannah
|
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Framing/Rough-in | 7/12/2006 | 7/13/2006 | 7/13/2006 | P | PASS |
Dave Hannah
|
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
FIRE-Final Inspection | 7/12/2006 | 7/13/2006 | 7/13/2006 | P | FAIL |
Troy Cobbley
|
|
|
Life safety was not ready for inspection due to inoperative exit signs and emergency lights. Also fire extinguishers need addressed. I went over life safety requirements with contractor.
|
FIRE-Final Inspection | 6/21/2006 | 6/22/2006 | 6/22/2006 | A | NR |
Forrest France
|
|
|
Project is not ready for final life safety inspection per contractor. Also discussed alarm permit issues as two SD will need to be relocated due to wall demo according to the general contractor.
|
BLD-Framing/Rough-in | 4/24/2006 | 4/25/2006 | 4/25/2006 | P | NR |
Dave Hannah
|
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|