BLD-Final | 4/12/2007 | 4/13/2007 | 4/13/2007 | A | PASS |
Tony Young
|
|
|
Todd; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
DOC - Permit Finaled | 4/13/2007 | 4/13/2007 | 4/13/2007 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 4/11/2007 | 4/11/2007 | 4/11/2007 | P | FAIL |
Tony Young
|
|
|
tod; Phone #: ###-#### Internet Inspection Request from: Victoria Beall conf on job,, need zoning,, need to seperate furnace from bedroom/bonus room,, (added a closet) need to make sure mechanical is ok w/ changes, ,, combustion air
|
BLD-Framing/Rough-in | 7/10/2006 | 7/10/2006 | 7/10/2006 | P | PASS |
Tony Young
|
|
|
TONY - REINSPECT FIREWALL; Phone #: ###-#### Internet Inspection Request from: Kim Olson firewall ok now
|
BLD-Energy code compliance | 7/4/2006 | 7/6/2006 | 7/6/2006 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 7/4/2006 at 10:42:08 PM. Contact: ###-####. ok to sheet rock interiors of units,, need to see firewall again prior to cover,, recieved new design from architect on f/wall,, need to continue 5/8 rock between post on patio areas then wrap with 2 layers,, then follow new design
|
BLD-Energy code compliance | 6/30/2006 | 7/3/2006 | 7/3/2006 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/30/2006 at 5:41:07 PM. Contact: ###-####.no insulation yet
|
BLD-Framing/Rough-in | 6/29/2006 | 6/30/2006 | 6/30/2006 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 6/29/2006 at 7:10:00 PM. Contact: ###-####. ok to cover exterior on front,, f/w is in place,,, still need fix from designer and plan review on rear patio area,, ok to insulate after mechanical rough pass scheduled for monday
|
BLD-Conference | 6/28/2006 | 6/29/2006 | 6/29/2006 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 6/28/2006 at 1:15:10 PM. Contact: ###-####. conf on firewall,, w/ owner builder,, need to clarify w/ plan review on privacy wall/s
|
BLD-Conference | 6/26/2006 | 6/27/2006 | 6/27/2006 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 6/26/2006 at 2:07:51 PM. Contact: ###-#### .portion of firewall is not built per townhouse specs
|
BLD-Framing/Rough-in | 5/24/2006 | 5/24/2006 | 5/24/2006 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 5/24/2006 at 8:24:15 AM. Contact: ###-####. one layer of upper attic area above other roof ok
|
BLD-Conference | 5/16/2006 | 5/17/2006 | 5/17/2006 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 5/16/2006 at 5:20:16 PM. Contact: ###-####. frame and firewall ?s
|
BLD-Foundation | 4/26/2006 | 5/1/2006 | 5/1/2006 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 4/26/2006 at 2:31:24 PM. Contact: ###-####. poured
|
BLD-Footing | 4/26/2006 | 4/27/2006 | 4/27/2006 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 4/26/2006 at 2:31:07 PM. Contact: ###-####. wip,, need to have point load ftgs per red line on plans
|