Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD06-00947
StatusFinaled
Name DANIEL BROWN
Site Address 1338 N LILLY DR
Project NameKEENELAND PARK
Customer Number 
ePlanReviewNo
Description
Lot 16 Block 5 * To construct a new 3,800 square feet, two story, four unit apartment building, each unit is two bedroom and has a separate entry and is two stories. The Type "A" unit has two full bathrooms and is 989 square feet, the Type "B" unit has one and one half bathrooms and is 913 square feet. All construction per the approved plans and attached comment list. MJP DRH05-00319 CUP05-00009
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/12/20102/12/20102/12/2010APASS
DetailsMike Jordan
All other finals are done. Ok for perm occ.
BLD-Final5/23/20075/23/20075/23/2007PPART
DetailsMike Jordan
KENNY; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Handrail repaired. Ok for temp occ. Will be ok for perm occ once others final.
BLD-Final5/22/20075/23/20075/23/2007AFAIL
DetailsMike Jordan
Kenny; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. Handrail to high.
FIRE-Final Inspection5/8/20075/9/20075/9/2007APASS
DetailsTroy Cobbley
life safety passed
BLD-Energy code compliance4/6/20074/6/20074/6/2007PPASS
DetailsMike Jordan
kenny - insulation for cover ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. ok to cover.
BLD-Energy code compliance4/5/20074/6/20074/6/2007AFAIL
DetailsMike Jordan
kenny; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Needs to remove tubs and install 5/8 type X at 1hr. walls.
BLD-Framing/Rough-in4/4/20074/4/20074/4/2007PPASS
DetailsMike Jordan
Kenny; Phone #: ###-#### Internet Inspection Request from: Stacie Backu. ok to insul.
BLD-Framing/Rough-in3/15/20073/16/20073/16/2007APASS
DetailsMike Jordan
Sheering Kenny; Phone #: ###-#### Internet Inspection Request from: Stacie Backus. Exterior shear nailing.
BLD-Energy code compliance1/25/20071/26/20071/26/2007APASS
DetailsJim Storey
jordan; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Foundation1/25/20071/25/20071/25/2007PPASS
DetailsMike Jordan
MATT; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Footing1/24/20071/24/20071/24/2007PPART
DetailsTom Arcoraci
donny; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Footing1/23/20071/23/20071/23/2007PPART
DetailsMike Jordan
matt; Phone #: ###-#### Internet Inspection Request from: Darla Downs. Noted conc. pipe under nw corner of footing. contractor to verify if abonded or still in use. if abonded needs to be removed from footing footprint.
BLD-Foundation1/22/20071/22/20071/22/2007PCANC
DetailsMike Jordan
matt; Phone #: ###-#### Internet Inspection Request from: Darla Downs