BLD-Final | 8/10/2006 | 8/11/2006 | 8/11/2006 | A | PASS |
Mike Jordan
|
|
|
Keybox code is 2040. All trades and fire finaled. Thank you.; Phone #: ###-#### Internet Inspection Request from: John Lodman
|
DOC - Permit Finaled | 8/11/2006 | 8/11/2006 | 8/11/2006 | P | PASS |
Mike Jordan
|
|
|
vanilla finish ok. loc issued.
|
FIRE-Final Inspection | 8/10/2006 | 8/10/2006 | 8/10/2006 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled
|
BLD-Other | 7/24/2006 | 7/25/2006 | 7/25/2006 | A | PASS |
Mike Jordan
|
|
|
sorry about yesterday, only looking for ceiling cover inspection. access code is 2040; Phone #: ###-#### Internet Inspection Request from: John Lodman. pending elec. insp. above grid.
|
BLD-Final | 7/24/2006 | 7/24/2006 | 7/24/2006 | P | NR |
Mike Jordan
|
|
|
Pending fire sprinkler. 2040 for keybox access. Thank you.; Phone #: ###-#### Internet Inspection Request from: John Lodman. Needs to have all other trades finaled prior to bldg. final.
|
BLD-Energy code compliance | 6/1/2006 | 6/2/2006 | 6/2/2006 | A | PASS |
Mike Jordan
|
|
|
Inspection scheduled as requested. Insulation from top of wall to roof deck complete. I am having G&G correct the FSK to 10' aff as we are only covering to 10'. They will correct first thing am. key box is 2040.; Phone #: ###-#### Internet Inspection Request from: John Lodman. Framning issue has been resolved.
|
BLD-Wall cover | 6/1/2006 | 6/1/2006 | 6/1/2006 | A | NR |
Mike Jordan
|
|
|
keybox is 2040 if locked. ; Phone #: ###-#### Internet Inspection Request from: John Lodman
|
BLD-Framing/Rough-in | 5/31/2006 | 6/1/2006 | 6/1/2006 | A | FAIL |
Mike Jordan
|
|
|
###-#### - john. Needs to provide 18" min from door to wall at office door.
|
BLD-Grading Inspection | 6/1/2006 | 6/1/2006 | 6/1/2006 | A | CANC |
Mike Jordan
|
|
|
keybox is 2040 if locked.; Phone #: ###-#### Internet Inspection Request from: John Lodman Inspection cancelled from web by: John Lodman
|