FIRE-Final Inspection | 3/1/2007 | 3/1/2007 | 3/1/2007 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
BLD-Final | 2/28/2007 | 3/1/2007 | 3/1/2007 | P | PASS |
Dave Hannah
|
|
|
greg; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok for perm occ
|
Permanent Occupancy | | 3/1/2007 | 3/1/2007 | | DONE |
|
|
|
|
BLD-Final | 2/23/2007 | 2/26/2007 | 2/26/2007 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/23/2007 at 7:42:59 PM. Contact: ###-####. ok for perm occ after other trades go perm
|
BLD-Conference | 9/22/2006 | 9/22/2006 | 9/22/2006 | P | DONE |
Dave Hannah
|
|
|
|
BLD-Final | 9/22/2006 | 9/22/2006 | 9/22/2006 | P | PART |
Dave Hannah
|
|
|
ok for temp occ ok for perm occ after other trades go perm and sheel is finished
|
BLD-Other | 8/31/2006 | 9/1/2006 | 9/6/2006 | P | PART |
Dave Hannah
|
|
|
This is for a Structural Fianl inspection. If you have any questions please contact Greg Bolton @ ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson ok for temp occ ok for perm occ after other trades go perm and shell permit is finished
|
BLD-Other | 8/31/2006 | 9/1/2006 | 9/1/2006 | A | PART |
Forrest France
|
|
|
Need to repair one emergency light at the main entrance, final pending shell and project related fire alarm permit finals.
|
BLD-Other | 8/29/2006 | 8/30/2006 | 8/30/2006 | A | FAIL |
Forrest France
|
|
|
Fire extinguishers are not installed, missing door hardware, need suite addresses, floor and ceiling tile are not completed, need to approve fire alarm prior to life safety final, scope of work is not completed.
|
BLD-Other | 8/15/2006 | 8/15/2006 | 8/15/2006 | P | PART |
Dave Hannah
|
|
|
greg Note: ceiling; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to drop in ceiling pannels
|
BLD-Framing/Rough-in | 8/14/2006 | 8/15/2006 | 8/15/2006 | A | PART |
Dave Hannah
|
|
|
greg ###-#### ceiling ok to drop per but need to plunb and add field wires
|
BLD-Other | 8/14/2006 | 8/14/2006 | 8/14/2006 | P | NH |
Tony Young
|
|
|
###-#### - craIG NOTE: CEILING INSPECTION new tile floor,, sign on door to stay out
|
BLD-Framing/Rough-in | 6/29/2006 | 6/30/2006 | 6/30/2006 | A | PASS |
Dave Hannah
|
|
|
If you have any questions please contact Greg Bolton at ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson ok to cover
|