FIRE-Final Inspection | 3/1/2007 | 3/1/2007 | 3/1/2007 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
BLD-Final | 2/28/2007 | 3/1/2007 | 3/1/2007 | P | PASS |
Dave Hannah
|
|
|
greg; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok for perm occ
|
Permanent Occupancy | | 3/1/2007 | 3/1/2007 | | DONE |
|
|
|
|
BLD-Final | 2/23/2007 | 2/26/2007 | 2/26/2007 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/23/2007 at 7:38:08 PM. Contact: ###-####. ok fo perm occ after other trades sign off
|
BLD-Final | 9/22/2006 | 9/22/2006 | 9/22/2006 | P | PART |
Dave Hannah
|
|
|
ok for temp occ ok for perm afterother trades go perm and shell is finished
|
BLD-Other | 8/31/2006 | 9/1/2006 | 9/1/2006 | A | PART |
Forrest France
|
|
|
Final pending shell and project related fire alarm permit finals.
|
BLD-Other | 8/29/2006 | 8/30/2006 | 8/30/2006 | A | FAIL |
Forrest France
|
|
|
Fire life safety is not completed at this time.
|
BLD-Framing/Rough-in | 8/16/2006 | 8/17/2006 | 8/17/2006 | A | PASS |
Dave Hannah
|
|
|
Ceiling inspection please////###-#### greg ok to drop in ceiling panels after all other trades have oked
|
BLD-Framing/Rough-in | 6/29/2006 | 6/30/2006 | 6/30/2006 | A | PASS |
Dave Hannah
|
|
|
If you have any questions please contact Greg Bolton at ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson
|
BLD-Other | 8/31/2006 | 9/1/2006 | | P | |
Dave Hannah
|
|
|
This is for a Final Structural inspection. If you have any questions please contact Greg Bolton @ ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson
|