Permit Information
Permit NumberBLD06-01142
StatusFinaled
Name WILLOWBROOK DEVELOPMENT
Site Address 11031 JOPLIN RD
Project Name 
Customer NumberSEE COMMENTS
ePlanReviewNo
Description
WILLOWBROOK DEV RCE #2358//Republic Storage at Joplin (Building #4 - D) - To construct a new pre-engineered metal, one story, storage building. This building will be divided by a four-hour fire wall into two buildings (7,200 sq. ft. and 8,400 square feet). Building "D" will have a total of 48 separate storage units. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference5/1/20075/2/20075/2/2007APASS
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Staci Smith
OK for Perm Occ.
Permanent Occupancy 5/2/20075/2/2007 DONE
Details
FIRE-Final Inspection4/30/20075/1/20075/1/2007APASS
DetailsTroy Cobbley
Life safety passed. See project history for agreement with the Boise Fire Dept. on knox box, gate width and missing fire hydrant.
FIRE-Final Inspection4/26/20074/26/20074/26/2007PPART
DetailsForrest France
Okay for temp occ. per agreement with the fire dept.
FIRE-Conference4/23/20074/23/20074/23/2007ADONE
An onsite meeting was held today between Jacob Smith, of Willowbrook Construction and the Assistant Fire Marshal, Captain Mark Senteno of Boise Fire. This meeting regarded the installation of the electronic access gate and the 3rd fire hydrant that was shown on plans, but not installed. Captain Senteno has approved the 16'-10" wide electronic gate with the understanding that the installed gate will have an Opticom system installed ASAP per Boise City Fire department requirements. The remote area where the 3rd hydrant was shown on plans was not part of the permitted scope of work for this project. Captain Senteno has approved the current project as is; with the understanding that the 3rd fire hydrant will be installed under a separate building permit as construction occurs in the remote area where the 3rd hydrant is shown on current plans.
Code Occupancy Approval4/18/20074/18/20074/19/2007PPASS
DetailsCarol Montgomery
Inspected on 4-18-2007 - Meets compliance with Design Review (DRH05-00270)
BLD-Final4/13/20074/16/20074/16/2007ANR
DetailsJim Sly
Phone #: ###-####
FIRE-Final Inspection4/12/20074/13/20074/13/2007AFAIL
DetailsTroy Cobbley
Plan SP-1 whows three fire hydrants installed along Joplin Road. Only two are installed. Provide the third hydrant. The two fire hydrants installed along Joplin Road are mounted too low. See NFPA 24 - 7.3.3. The access gate into the property does not meet the minumum 20' width requirement. Also this gate needs to be provided with an approved entry system such as the Opticon System.
BLD-Framing/Rough-in4/2/20074/3/20074/3/2007APASS
DetailsJim Sly
amish; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Aging Inspection12/8/200612/8/200612/11/2006 DONE
DetailsJim Sly
WIP