Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD06-01208
StatusFinaled
Name SHILOH DEVELOPMENT LTD CO
Site Address 2282 S GEKELER LN
Project NameAshleigh Commons
Customer Number 
ePlanReviewNo
Description
Ashleigh Commons Building 3 Units 11 (2282 Gekeler) A two hour fire wall will be used to separate this 3 unit multi-family/condominium building into two separate buildings. To construct a new 2,346 square feet, two story, wood framed, single unit portion of this building with attached garages. The first floor is 1,176 square feet, 440 square feet of this area is for the garages. The second floor is 730 square feet. This unit is 2 story, 3 bedroom and 3-1/2 baths with an attached two car garage. NOTE: The installation of the fire wall is being driven by the 1,500 gpm fire flow at the hydrant. All construction per the approved plans and attached comment list. Protected penetrations are allowed per 2003 IBC Sec. 705.Refer to BLD 06-01207 for the permit on other side of the fire wall. MJP CUP 05-00006
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/9/200711/13/200711/13/2007APASS
DetailsJim Storey
steve Phone #: ###-####
Code Occupancy Approval11/9/200711/9/200711/9/2007APASS
DetailsWm. Michael Meloy
Compliance met.
FIRE-Final Inspection11/5/200711/5/200711/5/2007PPASS
DetailsForrest France
Required fire extinguishers have been provided, fire life safety passed.
BLD-Energy code compliance8/17/20078/20/20078/20/2007APASS
DetailsJim Storey
steve Nt: 3rd unit Phone #: ###-####
BLD-Energy code compliance8/15/20078/16/20078/16/2007ANR
DetailsJim Storey
steve Phone #: ###-####
BLD-Framing/Rough-in8/15/20078/16/20078/16/2007APART
DetailsJim Storey
steve Phone #: ###-####
BLD-Framing/Rough-in7/17/20077/17/20077/17/2007PPART
DetailsJim Storey
steve - shear wall Phone #: ###-####
BLD-Foundation6/1/20076/4/20076/4/2007PPASS
DetailsJim Sly
clint; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Footing5/30/20075/31/20075/31/2007PPASS
DetailsJim Storey
clint; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
Extend Permit 180 days 12/8/200612/8/2006 DONE
Extended permit application per Shiloh. Application extended until April 23, 2007.