BLD-Final | 3/20/2007 | 3/21/2007 | 3/21/2007 | A | PASS |
Mike Jordan
|
|
|
joe - pls call prior to inspection ; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Noted that no framing insp. were called in. All work is complete. Noted that all other trades were inspected and finaled. All work APPEARS to be done in compliance with approved plans.
|
Permanent Occupancy | | 3/21/2007 | 3/21/2007 | | DONE |
|
|
|
|
FIRE-Final Inspection | 3/20/2007 | 3/20/2007 | 3/20/2007 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 3/14/2007 | 3/14/2007 | 3/14/2007 | P | FAIL |
Troy Cobbley
|
|
|
Sprinkler heads are overspace in two of the new offices and one pendant is overspaced outside fo the new offices at the east wall. A sprinkler permit will be required for this work. Life safety will be ok to final when sprinkler work is complete.
|
FIRE-Sprinkler Rough-in | 3/14/2007 | 3/14/2007 | 3/14/2007 | P | FAIL |
Troy Cobbley
|
|
|
Sprinkler heads are overspace in two of the new offices and one pendant is overspaced outside fo the new offices at the east wall. A sprinkler permit will be required for this work. Life safety will be ok to final when sprinkler work is complete.
|
BLD-Final | 3/14/2007 | 3/15/2007 | 3/14/2007 | P | CANC |
Mike Jordan
|
|
|
joe Note: please call 1/2 hr prior inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Inspection cancelled from web by: Patricia Smith
|
BLD-Aging Inspection | 8/9/2006 | 8/9/2006 | 8/9/2006 | | PASS |
Mike Jordan
|
|
|
wip
|