BLD-Final | 10/16/2007 | 10/17/2007 | 10/17/2007 | A | PASS |
Jim Storey
|
|
|
to final out permit (This activity was added in error so we have changed the case status back to Issued.)
|
FIRE-Final Inspection | 10/12/2007 | 10/15/2007 | 10/15/2007 | A | PASS |
Forrest France
|
|
|
Life safety inspection completed acceptable.
|
BLD-Final | 10/2/2007 | 10/2/2007 | 10/3/2007 | P | PART |
Jim Storey
|
|
|
Jim, If you cant gain access, ask the ladies at the desk for assistance, or let me know and I can meet you on site. Thanks. ###-#### Phone #: ###-#### Internet Inspection Request from: Adam Johnson final ok on my side no card on site unable to verify fire insp.
|
BLD-Final | 9/21/2007 | 9/24/2007 | 9/24/2007 | A | NR |
Jim Sly
|
|
|
Fire caulking complete, Lockset Removed. If you have any questions, call ###-####. Adam Phone #: ###-#### Internet Inspection Request from: Adam Johnson Talked to Adam.......Need Tested listed assembly for penitrating items thru 2hr wall.
|
BLD-Final | 7/19/2007 | 7/20/2007 | 7/24/2007 | P | FAIL |
Jim Storey
|
|
|
Jim, Please call appx 30 min prior to inspection so we can meet you on site and coordinate access. Thanks, Adam. Phone #: ###-#### Internet Inspection Request from: Adam Johnsonno dead bolt for egress/ fire stopping 2hr cable penatrations.
|
BLD-Aging Inspection | 5/28/2007 | 5/28/2007 | 5/29/2007 | | PART |
Jim Storey
|
|
|
talked w/art he will finsh the permitup w fire and bld.
|
BLD-Aging Inspection | 12/22/2006 | 12/22/2006 | 12/22/2006 | | NR |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 10/18/2006 | 10/18/2006 | 10/18/2006 | | FAIL |
Jim Storey
|
|
|
no requist for final insp.
|
BLD-Aging Inspection | 8/18/2006 | 8/18/2006 | 8/18/2006 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Framing/Rough-in | 6/2/2006 | 6/5/2006 | 6/5/2006 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/2/2006 at 1:13:19 PM. Contact: ###-####.
|