BLD-Final | 6/26/2006 | 6/27/2006 | 6/27/2006 | P | PASS |
Dave Hannah
|
|
|
greg - reinsp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok for perm occ
|
FIRE-Final Inspection | 6/26/2006 | 6/27/2006 | 6/27/2006 | A | PASS |
Forrest France
|
|
|
c/n items are complete, final inspection passed.
|
Permanent Occupancy | | 6/27/2006 | 6/27/2006 | | DONE |
|
|
|
|
BLD-Final | 6/23/2006 | 6/26/2006 | 6/26/2006 | A | CANC |
Dave Hannah
|
|
|
greg - 2nd floor; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
FIRE-Final Inspection | 6/23/2006 | 6/26/2006 | 6/26/2006 | A | FAIL |
Forrest France
|
|
|
Need to provide correct suite address, mount fire extinguisher as discussed, door stoppers at the main entry/exit doors to the suite shall be removed. NOTE: The tenant has occupied the space and is conducting business without and prior to occupancy certificate approval, general contractor is aware of the situation.
|
FIRE-Final Inspection | 6/23/2006 | 6/23/2006 | 6/23/2006 | P | CANC |
Forrest France
|
|
|
Cancel per GC due to conditions at the building which prevent final testing.
|
BLD-Framing/Rough-in | 6/19/2006 | 6/20/2006 | 6/20/2006 | A | PASS |
Dave Hannah
|
|
|
greg; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|