Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD06-01353
StatusFinaled
Name BOISE CITY (BOISE AIR TERMINAL)
Site Address 3201 W AIRPORT WAY
Project NameAIRPORT-Walkway Extension
Customer Number 
ePlanReviewNo
Description
(Boise Airport Terminal - Passenger Ground Load Walkway Extension) * To construct an approximate 182 lineal foot extension to thesouth end of the existing 190 lineal foot west noncombustible, open air, pedestrian walkway. This walkway is used for shelter and security while ground loading passengers onto aircraft. The new total length of the west walkway is approximately 372 feet by 14 feet wide. This pedestrian walkway is located on the south side of the airport terminal building. The attendant kiosk shown on the plans is not part of this permit approval. All construction per the approved plans on file. The original walkway was constructed under BLD04-00849. DRH99-00206/CUP99-00130/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/26/20072/27/20072/27/2007APASS
DetailsJim Storey
around 10:00 cod cancled final ok no occ card signed job card.
BLD-Final2/23/20072/26/20072/26/2007PCANC
DetailsJim Storey
steve; Phone #: ###-#### Internet Inspection Request from: Cathy Chilesaround 10:00 cod cancled tommarow.
FIRE-Final Inspection2/23/20072/26/20072/26/2007APASS
DetailsTroy Cobbley
life safety finaled
BLD-Aging Inspection1/17/20071/17/20071/17/2007 PASS
DetailsJim Storey
wip
BLD-Aging Inspection11/16/200611/16/200611/16/2006 PASS
DetailsJim Storey
wip