Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD06-01354
StatusFinaled
Name MARTIN A HALE
Site Address 3201 W AIRPORT WAY
Project NameAIRPORT
Customer Number 
ePlanReviewNo
Description
(THREE AIRCRAFT LOADING WALKWAYS - BOISE AIR TERMINAL - CONCOURSE B) This building is fire sprinklered to substitute for 1-hr construction. To install three (3) new aircraft loading walkways at the Boise City Airport (Gates 11 and 14 in "Original Concourse B" and Gate 20 in "Concourse B Extension"). New cantilevered floors and new concrete piers will be constructed at Gate 11 and Gate 20. The existing floor and pier at Gate 14 will be maintained and reused. Work is to include concrete piers, cantilevered floor areas (steel beams supporting concrete and metal floor decks), exterior walls at cantilevered floor areas (EIFS, gypsum sheathing, metal studs, batt insulation, vapor barrier, gypsum board), roofs over cantilevered floor areas (steel deck, rigid insulation, single ply membrane roofing), suspended acoustical ceilings, new doors, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference2/26/20072/27/20072/27/2007APASS
DetailsJim Storey
around 10:00 cod cancled
DOC - Permit Finaled2/27/20072/27/20072/27/2007PPASS
DetailsJim Storey
BLD-Final2/23/20072/26/20072/26/2007PCANC
DetailsJim Storey
steve; Phone #: ###-#### Internet Inspection Request from: Cathy Chilesaround 10:00 cod cancled tommarow.
FIRE-Final Inspection2/23/20072/26/20072/26/2007APASS
DetailsTroy Cobbley
life safety finaled
FIRE-Final Inspection12/20/200612/21/200612/21/2006APART
DetailsForrest France
Partial inspection, gate 20 only.
FIRE-Final Inspection12/19/200612/20/200612/20/2006ADEFR
DetailsForrest France
No time available to complete this inspection today, to be rescheduled per agreement with contractor.
BLD-Final12/19/200612/20/200612/20/2006APART
DetailsJim Storey
Benji; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt gate 20 ok for use pending others aproval.
BLD-Framing/Rough-in11/22/200611/24/200611/24/2006APASS
DetailsJim Storey
benji; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Framing/Rough-in11/16/200611/20/200611/20/2006APART
DetailsJim Storey
benji; Phone #: ###-#### Internet Inspection Request from: Patricia Smith wall and roof framing ok
BLD-Framing/Rough-in11/15/200611/16/200611/16/2006PDEFR
DetailsJim Storey
benji; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Framing/Rough-in11/2/200611/6/200611/6/2006APART
DetailsJim Storey
bengi; Phone #: ###-#### Internet Inspection Request from: Patricia Smith welding apears ok pending bolt trourqe/ how to meed floor insulation value.
BLD-Concrete10/10/200610/12/200610/12/2006APASS
DetailsJim Storey
benji; Phone #: ###-#### Internet Inspection Request from: Patricia Smith rebar ok pending report from si.