Permit Information
Permit NumberBLD06-01392
StatusFinaled
Name ST LUKES REG MED CNTR
Site Address 190 E BANNOCK ST
Project NameST LUKES
Customer Number 
ePlanReviewNo
Description
(RCE 3018 - Tim Austin) (ST LUKES-NORTH & EAST WINGS-GROUND FLOOR REMODEL) To remodel approximately 16,000 sq.ft. of I-2 hospital exam rooms, surgery & support areas to prepare for construction of three new operating rooms with surgery waiting and POHA suite with administrative support areas. Work includes selective interior demolition; new interior, non-combustible walls to create exit access path to serve all areas, to divide specialized service suites and rooms; add new interior finishes, cabinetry and specialized equipment; maintain integrity of 2-hour floor & shaft assemblies and 1-hour smoke barrier walls and construct new 1-hour incidental use walls, all at locations as indicated on Sheet A0.3; upgrade electrical, mechanical, plumbing, medical gases, sprinkler & alarm systems to meet tenant needs and comply with current adopted codes and ordinances. Separate applications and permits are required for modifications to sprinkler and alarm systems, as regulated by the fire department, before any such work is commenced. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/1/20076/1/20076/1/2007APASS
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Phil Doble ok for perm occ
FIRE-Final Inspection5/30/20075/31/20075/31/2007APASS
DetailsForrest France
Fire life safety inspection passed, contractor to install one missing exit sign as indicated on approved plans, to be verified at next visit for the adjacent remodel final.
BLD-Final5/30/20075/30/20075/31/2007APART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Phil Doble ok after fire life saftey finals
BLD-Wall cover3/9/20073/9/20073/9/2007APART
DetailsDave Hannah
Phone #: ###-#### ok to cover
BLD-Wall cover3/1/20073/1/20073/1/2007APART
DetailsDave Hannah
Phone #: ###-#### ok to cover ceilings in this phase
BLD-Other2/22/20072/22/20072/22/2007APART
DetailsDave Hannah
Grid ceiling Phone #: ###-#### ok to cover ceiling grid in this phase
BLD-Other1/30/20071/30/20071/30/2007APART
DetailsDave Hannah
ceiling cover Phone #: ###-#### ceiling grid ok in this phase but shaft needs to be reworked
BLD-Wall cover1/2/20071/2/20071/2/2007APART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Phil Dobleok to cover
BLD-Wall cover12/14/200612/14/200612/14/2006APART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Phil Doble
BLD-Framing/Rough-in11/17/200611/17/200611/17/2006APART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Phil Doble phase 4 ok to cover pre opp room walls
BLD-Wall cover10/26/200610/26/200610/27/2006PDONE
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Phil Doble
BLD-Wall cover10/27/200610/27/200610/27/2006APASS
DetailsDave Hannah
Phone #: ###-#### ok to drop in ceiling tiles in first area
BLD-Framing/Rough-in10/4/200610/4/200610/4/2006APART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Phil Doble first phase ok to cover
BLD-Framing/Rough-in9/27/20069/27/20069/28/2006PPART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Phil Doble ok to cover waiting room walls