Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-01469
StatusFinaled
Name SCHWALBE & STOREY CONTRACTORS
Site Address 8660 W EMERALD ST Unit: 112
Project NameBENJAMIN PLAZA
Customer Number 
ePlanReviewNo
Description
RCE 8717 (CEDAR HEALTH CENTER - BENJAMIN PLAZA - STE 112)To remodel an existing tenant space to create two spaces this space will be 1644 sq ft for a new CHRIOPRACTIC office tenant space, the other space will be under Bld06-01470. The work under this permit will be in conjuction with Bld06-01469 to construct a four foot partition in existing hallway to divide spaces, to install new door to access core area restrooms, and to remove half wall and counter, this building is fully fire sprinklered any alterations to the sprinkler system shall be per NFPA #13 as regulated by the fire department. RMh
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/24/20068/24/20068/24/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/24/2006 at 10:14:33 AM. Contact: ###-####. ok for perm occ.
FIRE-Final Inspection8/23/20068/24/20068/24/2006APASS
DetailsTroy Cobbley
Life safety finaled
BLD-Final8/23/20068/24/20068/24/2006ANR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/23/2006 at 3:48:57 PM. Contact: ###-####. Needs other traDES TO FINAL.
Permanent Occupancy 8/24/20068/24/2006 DONE
Details
Permanent Occupancy 8/24/20068/24/2006 DONE
Details
Permanent Occupancy 8/24/20068/24/2006 DONE
Details
Permanent Occupancy 8/24/20068/24/2006 DONE
Details
Permanent Occupancy 8/24/20068/24/2006 DONE
Details
BLD-Framing/Rough-in8/2/20068/3/20068/3/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/2/2006 at 1:05:17 PM. Contact: ###-####.
BLD-Framing/Rough-in7/11/20067/12/20067/12/2006APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 7/11/2006 at 5:57:14 PM. Contact: ###-####. Needs elec. ri. insp. Also needs to go back to plan review to reflect changes and modifications.