Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-01520
StatusFinaled
Name JIM CORNWELL
Site Address 2138 S CHIPPEWA PL
Project Name 
Customer Number 
ePlanReviewNo
Description
7/26/2006 THIS PERMIT THIS DAY IS MODIFIED TO REFLECT TH APPROVAL OF THE FLOOR PLAN FOR THE 2ND PHASE OF THE PROJECT AS NOTED IN THE ORIGINAL PROJECT DESCRIPTION" . THERE WILL BE ADDED VALUE OF ($20,000). "NO CONTRACTOR REGISTRATION PROVIDED APPLICANT CERTIFIES EXEMPTION PER IDAHO STATUTE 54-5205". This project is for the addition of a 624s.f. attached garage and a detached 624s.f. garage /shop. In the next phase of this project the dwelling will be remodeled and the master suite relocation will allow for the placement of the breezeway roof structure to allow the detached garage shop of this permit to be connected. R-1A ok per Sue Hansen. Separate electrical, permit is required. All per the approved plans as marked and plan review notes. pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference2/3/20102/4/20102/4/2010PPASS
DetailsMike Jordan
Please call 20 minutes before arrival and I will provide access. Phone #: ###-#### Internet Inspection Request from: James Cornwell
DOC - Permit Finaled2/4/20102/4/20102/4/2010PPASS
DetailsMike Jordan
Letter of compliance was issued.
BLD-Aging Inspection1/27/20101/27/20102/1/2010 PASS
DetailsMike Jordan
Called and spoke with homeowner, should be done by end of the week and will call in for final.
BLD-Aging Inspection11/25/200911/25/200911/25/2009 PASS
DetailsMike Jordan
wip. homeowner is doing all work. almost completed.
BLD-Conference6/11/20096/12/20096/12/2009ADONE
DetailsJim Sly
Please call 15 minutes before you get there and I''ll provide access. Phone #: ###-#### Internet Inspection Request from: James Cornwell
BLD-Energy code compliance11/14/200811/14/200811/14/2008APASS
DetailsMike Jordan
Please call 15 minutes before arrival. I will provide access.

Thanks,

Jim Cornwell Phone #: ###-#### Internet Inspection Request from: James Cornwell
BLD-Framing/Rough-in11/12/200811/12/200811/12/2008PPASS
DetailsMike Jordan
Please call 15 minutes before arrival. I will provide access.

Jim Cornwell Phone #: ###-#### Internet Inspection Request from: James Cornwell
BLD-Energy code compliance9/19/20089/19/20089/19/2008APASS
DetailsMike Jordan
Please call 20 minutes before arrival and I''ll provide access.

Thanks,

Jim Cornwell Phone #: ###-#### Internet Inspection Request from: James Cornwell
BLD-Framing/Rough-in9/18/20089/18/20089/18/2008APASS
DetailsMike Jordan
Please call 20 minutes before arrival. I will provide access.

Jim Cornwell Phone #: ###-#### Internet Inspection Request from: James Cornwell
BLD-Energy code compliance4/25/20084/25/20084/25/2008APASS
DetailsMike Jordan
Please contact 10 minutes before arrival. I will provide access. Phone #: ###-#### Internet Inspection Request from: James Cornwell
BLD-Framing/Rough-in4/21/20084/21/20084/21/2008PPASS
DetailsMike Jordan
Please call 10 minutes before arrival, I will provide access. Phone #: ###-#### Internet Inspection Request from: James Cornwell. Verified airseal package.
BLD-Framing/Rough-in2/14/20082/14/20082/14/2008PPART
DetailsMike Jordan
Inspection for new interior framing. Please call 15 minutes before arrival and I will provide access. Thanks, Jim Cornwell ###-#### Phone #: ###-#### Internet Inspection Request from: James Cornwell. Interior framed partition walls at converted garage.
BLD-Footing7/4/20077/5/20077/5/2007APASS
DetailsMike Jordan
This inspection is for the footing and foundation ''patches'' required for this remodel. Phone #: ###-#### Internet Inspection Request from: James Cornwell. New footing and stem wall for garage infill conversion.
BLD-Other11/13/200611/14/200611/14/2006APART
DetailsMike Jordan
Jim Note: Structural partial; Note: please call 1/2 hr prior Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. ok to cover garage, shop and breezeway.
BLD-Final10/2/200610/2/200610/2/2006PNR
DetailsMike Jordan
jim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Framing insp. Needs to get ri first.
BLD-Foundation7/25/20067/25/20067/25/2006PPASS
DetailsMike Jordan
daniel; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD-Footing7/18/20067/18/20067/18/2006PPART
DetailsMike Jordan
daniel; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. no one on site. needs to get proper clearance under rebar and use approved method of holding rebar in place. ok to place conc. left c/n.