BLD-Final | 9/27/2007 | 9/27/2007 | 9/27/2007 | P | PASS |
Mike Jordan
|
|
|
PW is done Phone #: ###-#### Internet Inspection Request from: Duane Seid
|
DOC - Permit Finaled | 9/27/2007 | 9/27/2007 | 9/27/2007 | P | PASS |
Mike Jordan
|
|
|
Letter of compliance issued for shell and core.
|
BLD-Final | 9/26/2007 | 9/26/2007 | 9/26/2007 | P | NR |
Mike Jordan
|
|
|
All Permits should be closed out now. I am ready for C.O. Phone #: ###-#### Internet Inspection Request from: Duane Seid. Needs pw.
|
FIRE-Final Inspection | 9/4/2007 | 9/5/2007 | 9/5/2007 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Final | 9/4/2007 | 9/4/2007 | 9/4/2007 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Duane Seid
|
FIRE-Conference | 7/26/2007 | 7/26/2007 | 7/27/2007 | P | CANC |
Troy Cobbley
|
|
|
Wrong inspection type called in. A final was needed.
|
BLD-Final | 7/26/2007 | 7/26/2007 | 7/26/2007 | P | PART |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Duane Seid temp ok all life saftey isues ok / signage tempary/ si afadavided on site for mike temp ok
|
FIRE-Final Inspection | 7/26/2007 | 7/26/2007 | 7/26/2007 | P | PART |
Troy Cobbley
|
|
|
A temporay occupancy was given until the east elevator has been inspected and approved. Until then the east elevator is to remain locked out and is not to be used. The west elevator is approved for use. Also one additional emergency light is required in the exit lobby of the first floor south exit. Temporary signage in the stair towers has been provided until the permanant signs have been made. The non approved hardware on the second floor pocket door has been removed. The three fire hydrants have been tested for flow.
|
BLD-Final | 7/24/2007 | 7/25/2007 | 7/25/2007 | P | NH |
Jim Storey
|
|
|
please call prior to arrival. I will be off and on site Phone #: ###-#### Internet Inspection Request from: Duane Seid called no call back 301
|
Code Occupancy Approval | 7/24/2007 | 7/24/2007 | 7/25/2007 | P | PASS |
Scott M.Brown
|
|
|
very little remaining due to flag poles amd tempoffice finalsigned off
|
BLD-Framing/Rough-in | 7/23/2007 | 7/23/2007 | 7/23/2007 | P | PART |
Mike Jordan
|
|
|
duane Phone #: ###-####. Partial walk thru with contractor. Stairs and handrails ok. Ok to place tile in stair enclosures. Needs to complete some misc. firecaulking, install smoke seal and sweeps on stair enclosur doors and provide UL listed door closers.
|
BLD-Wall cover | 7/19/2007 | 7/20/2007 | 7/20/2007 | A | PART |
Mike Jordan
|
|
|
Pre CO inspection, Inspect grid in small area before cover. Phone #: ###-#### Internet Inspection Request from: Duane Seid. Received details from contractor on Engineered judgements regarding alternate methods used for the 2hr. stair enclosures, elevator shaft and mech shafts. All aternate method details have been reviewed by architect and accepted by architect via RFI # 0041. A copy has been recieved by Boise City and wil be archived with plans and scanned into the permit. All work has been done in accordance with approved alternate details. Also did performed walk thru with contractor at both stair towers. Minor work is needed to complete these areas for final. Still need to inspect inside of elevator shafts for fire caulking which is nor completed as of this date.
|
BLD-Framing/Rough-in | 7/13/2007 | 7/13/2007 | 7/13/2007 | P | PASS |
Mike Jordan
|
|
|
duane Phone #: ###-####. 1st floor grid in hallway ok.
|
BLD-Framing/Rough-in | 7/9/2007 | 7/9/2007 | 7/9/2007 | P | PART |
Mike Jordan
|
|
|
duane Phone #: ###-####. Interior portion of elevator shaft, wip, will complete by thursday.
|
BLD-Framing/Rough-in | 7/5/2007 | 7/5/2007 | 7/5/2007 | P | PART |
Mike Jordan
|
|
|
Inspect shaft wall on fifth floor. Phone #: ###-#### Internet Inspection Request from: Duane Seid. Elevaor shaft, 4th and 5th floors. Will need to verify fire stop on interior of shaft prior to cabs being constructed.
|
BLD-Framing/Rough-in | 7/2/2007 | 7/2/2007 | 7/2/2007 | P | PART |
Mike Jordan
|
|
|
duane Phone #: 590-410. Elevator shaft wall at 1st, 2nd, and 3rd floors.
|
BLD-Energy code compliance | 6/29/2007 | 6/29/2007 | 6/29/2007 | P | PASS |
Mike Jordan
|
|
|
duane Phone #: 579-410. 2hr elevator shaft enclosure, 1st and 2nd floor. Energy for bldg envelope is ok and now completed.
|
BLD-Conference | 6/20/2007 | 6/21/2007 | 6/21/2007 | P | PASS |
Mike Jordan
|
|
|
inspect firesafing at slab edge on all floors. Phone #: ###-#### Internet Inspection Request from: Duane Seid. Inspected remainder of fire safeing at slab edge to curtain wall. Inspected two hour ceiling assemblies at south stair tower. Also did general walk thru. Contractor wants a tco by July 7th. Discussed with contractor want needs to be accomplished.
|
BLD-Conference | 6/11/2007 | 6/11/2007 | 6/11/2007 | P | PASS |
Mike Jordan
|
|
|
Inspect ceiling grid and shaft wall. Phone #: ###-#### Internet Inspection Request from: Duane Seid. Fatgrid at 1st floor ok. Partial framing at 1st floor south stairtower.
|
BLD-Wall cover | 5/30/2007 | 5/30/2007 | 5/30/2007 | A | PASS |
Mike Jordan
|
|
|
I am ready for lid inspections on floors 4 and five. Internet Inspection Request from: Duane Seid. Inspected grid for hardlids in restrooms on 4th and 5th floors. Additional layer of 5/8 type X added at closet on 2nd floor at south stairtower. Still working on heater at south stair tower.
|
BLD-Framing/Rough-in | 5/21/2007 | 5/21/2007 | 5/21/2007 | A | PASS |
Mike Jordan
|
|
|
Inspect grid ceilings in bathrooms for cover. Phone #: ###-#### Internet Inspection Request from: Duane Seid. fat grid in restrooms ok. Pending other trades prior to cover. Received paperwork for smoke stop system at slab edge to curtain wall. 2nd floor completed. Elec and plumbing fixtures have been removed from rated exit enclosure(south stair tower) that do not service the stair tower. Also noted that heaters have been installed in exit enclosures at first floor. Noted to contractor that boxes are non rated, need to be boxed out with double layer typex 5/8 rock or surface mounted. Also lacking second layer 5/8 type x at closet at second floor south stair wall.
|
BLD-Framing/Rough-in | 5/10/2007 | 5/11/2007 | 5/11/2007 | A | CANC |
Mike Jordan
|
|
|
Inspect Rough ins for Tennant Improvement space on second floor Phone #: ###-#### Internet Inspection Request from: Duane Seid
|
BLD-Conference | 5/9/2007 | 5/10/2007 | 5/10/2007 | A | PASS |
Mike Jordan
|
|
|
Inspect the south stair well for cover. Ceilings in the bathrooms need inspections for cover. Phone #: ###-#### Internet Inspection Request from: Duane Seid. Ok to cover south wall of south stairtower. Also inspected smoke stop application between slab edge and curtain wall at 2nd floor north end. Contractor to schedule framing inspection for TI on 2nd floor.
|
BLD-Conference | 5/7/2007 | 5/7/2007 | 5/7/2007 | P | PART |
Mike Jordan
|
|
|
Inspect firestop around perimeter of building. Phone #: ###-#### Internet Inspection Request from: Duane Seid. Inspected fatgrid for hardlid at exterior canopy. Framing for restroom was moved to achieve 18 clearance for ada. Also still waiting on paperworkwork for aspproved smokestop system at slab edge to curtainwall. Still needs to firecaulk at exterior south 2hr wall on south stasirtower. Also noted that conmtractor needs to remove some plumbing and elec. outlets at south stairtower mainlevel by riser room. Contractor also wanted to know the possibilities of eliminating the north shaft and place fire/smoke dampers for each duct and everyfloor opening. This may be fesible but is a major design change which would require drawing from architect and submitted to plan review.
|
BLD-Conference | 4/27/2007 | 4/27/2007 | 4/27/2007 | A | PART |
Mike Jordan
|
|
|
Visually inspected smoke stop system at slab edge to curtain wall at all levels at southwall only. Contractor to supply submittal of approved system. Also spoke with G. slane regarding EJ on 2 hr exit enclosures an shaft walls. It was noted that architect must approve EJ or contractor must use The approved listed assemblies as noted on the approved set of drawings.
|
BLD-Conference | 4/26/2007 | 4/26/2007 | 4/27/2007 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Conference | 4/25/2007 | 4/26/2007 | 4/26/2007 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Conference | 4/25/2007 | 4/25/2007 | 4/25/2007 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Conference | 4/25/2007 | 4/25/2007 | 4/25/2007 | A | CANC |
Mike Jordan
|
|
|
I will be in a meeting from 10-11, any time around then would be great. If you could call me 30 min before you show up i could have the proper people here to go through the fireproofing details that we discussed yesterday.
Thanks Phone #: ###-#### Internet Inspection Request from: Duane Seid. MOved to PM.
|
BLD-Conference | 4/23/2007 | 4/24/2007 | 4/24/2007 | A | PART |
Mike Jordan
|
|
|
Observe firesafing around curtain wall. Review engeneered detail of top of rated walls. Phone #: ###-#### Internet Inspection Request from: Duane Seid
|
BLD-Conference | 4/18/2007 | 4/19/2007 | 4/19/2007 | P | PART |
Mike Jordan
|
|
|
Observe framing and other MEP rough ins. Phone #: ###-#### Internet Inspection Request from: Duane Seid. Inspected interior framed walls for restrooms on levels 1 to 4. Needs to move one framed wall to achieve 18 inch clearance from door. Also waiting for approved exit enclosure details.
|
BLD-Conference | 4/10/2007 | 4/10/2007 | 4/10/2007 | A | PART |
Mike Jordan
|
|
|
I have some shaft walls that are ready for inspection Phone #: ###-####. Shaft walls for elevator and mech, inner layer. Will need top submit new details for alternate slip installation at header.
|
BLD-Footing | 4/3/2007 | 4/5/2007 | 4/5/2007 | A | PART |
Mike Jordan
|
|
|
Need to have a walk around to check, and inspect framing and MEP rough - ins. Phone #: ###-####. Curtain wall, shaft walls, vertical exit enclosure walls. Needs tech data for rated penetrations.
|
BLD-Framing/Rough-in | 3/26/2007 | 3/26/2007 | 3/26/2007 | P | PASS |
Mike Jordan
|
|
|
Have a few questions regarding framing in the stairwells. Phone #: ###-####
|
BLD-Conference | 3/13/2007 | 3/14/2007 | 3/14/2007 | A | DONE |
Mike Jordan
|
|
|
Mike, This is for reviewing the clearances in the stairwells between handrail and fire risers. Thanks, Duane Phone #: ###-####. Noted issue with riser equipment impeding on 48 inch clearance at landings. Equipment will have to be moved to maintain proper clearance.
|
BLD-Conference | 2/7/2007 | 2/8/2007 | 2/8/2007 | P | DONE |
Mike Jordan
|
|
|
Mike, I will have the structural engineer here. He leaves at 3pm so if you could come early afternoon that might work best if you schedule so allows. Thanks, Jeremy Phone #: ###-####
|
BLD-Conference | 2/6/2007 | 2/7/2007 | 2/7/2007 | P | DONE |
Mike Jordan
|
|
|
Mike, I spoke with Dave Hannah and we are going to meet tomorrow to go over fireproofing requirements one last time to interpret the code. Dave indicated he would get a hold of you to schedule a time when both of you could come. Thanks Jeremy Phone #: ###-####. Will meet with structural engineer tommorrow to have him note which elements are load carring at shafts.
|
BLD-Conference | 2/2/2007 | 2/2/2007 | 2/2/2007 | A | DONE |
Mike Jordan
|
|
|
Received phone call from special insp. on site noting problems with conc. contractor. Arrived on site to asses situation and spoke with general contractor to make certain that remainder of work is done with in code and job specs.
|
BLD-Conference | 1/31/2007 | 1/31/2007 | 1/31/2007 | A | DONE |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 1/31/2007 at 7:23:16 AM. Contact: ###-####.
|
BLD-Conference | 1/30/2007 | 1/30/2007 | 1/30/2007 | A | DONE |
Mike Jordan
|
|
|
job site visit. Reviewed special insp reports, spoke with on site special insp and contractors. Getting ready for spray applied fireproffing and lay out for rated shafts and stair enclosures. spoke with ISI regarding rated const. Will set up meeting prior to const. to go over plans.
|
BLD-Framing/Rough-in | 1/9/2007 | 1/9/2007 | 1/9/2007 | P | DEFR |
Mike Jordan
|
|
|
1st deck pour tomorrow am, MTI regularly inspecting welding and rebar, do you want to see this first deck? Phone #: ###-####. Special insp was pergformed. ran out of time.
|
BLD-Framing/Rough-in | 11/29/2006 | 11/30/2006 | 11/30/2006 | A | PASS |
Mike Jordan
|
|
|
Welding inspection, MTI is scheduled to be on site at 900am.; Phone #: ###-#### Internet Inspection Request from: Brock Callister. Met with MTI welding inspector on site and went over inspection proceedures and what was required as per approved plans.
|
BLD-Foundation | 11/1/2006 | 11/2/2006 | 11/2/2006 | P | PASS |
Mike Jordan
|
|
|
Pour is scheduled for 100pm.; Phone #: ###-#### Internet Inspection Request from: Brock Callister
|
BLD-Footing | 11/1/2006 | 11/2/2006 | 11/2/2006 | P | PASS |
Mike Jordan
|
|
|
Pour is scheduled for 100pm.; Phone #: ###-#### Internet Inspection Request from: Brock Callister
|
BLD-Foundation | 10/31/2006 | 10/31/2006 | 11/1/2006 | P | CANC |
Mike Jordan
|
|
|
Stem walls on north side of building. Set up for 1pm pour.; Phone #: ###-#### Internet Inspection Request from: Brock Callister
|
BLD-Footing | 10/31/2006 | 10/31/2006 | 10/31/2006 | P | DEFR |
Mike Jordan
|
|
|
Footings at building entrance. Set up for 1pm pour.; Phone #: ###-#### Internet Inspection Request from: Brock Callister. Conc placement was moved up. Already completed when on site. Did note that reinfircement and conc. tested and insp. by special insp.
|
BLD-Footing | 10/26/2006 | 10/27/2006 | 10/27/2006 | P | DEFR |
Mike Jordan
|
|
|
1pm pour. Exterior footings on west and south sides.; Phone #: ###-#### Internet Inspection Request from: Brock Callister. rebar insp. yesterday. Special insp. on site.
|
BLD-Footing | 10/26/2006 | 10/26/2006 | 10/26/2006 | P | PART |
Mike Jordan
|
|
|
2pm pour. These footings were inspected yesterday by MTI before the pour, mud was late, only 70 yds poured, remaining 50 yds today. ; Phone #: ###-#### Internet Inspection Request from: Brock Callister
|
BLD-Footing | 10/25/2006 | 10/25/2006 | 10/25/2006 | P | DEFR |
Mike Jordan
|
|
|
Exterior footings - east/north/west sides. Set up for 2pm pour.; Phone #: ###-#### Internet Inspection Request from: Brock Callister. special insp.
|
BLD-Footing | 10/20/2006 | 10/20/2006 | 10/20/2006 | A | PART |
Mike Jordan
|
|
|
10am pour scheduled; Phone #: ###-#### Internet Inspection Request from: Brock Callister. Clearance issues repaired. bolt templates being set, then cages will be lifted and tied prior to placement. wip.
|
BLD-Footing | 10/19/2006 | 10/19/2006 | 10/19/2006 | A | FAIL |
Mike Jordan
|
|
|
Footing 14.5, pour scheduled for 12pm, inspection ready after 1030am.; Phone #: ###-#### Internet Inspection Request from: Brock Callister. clearance issues, excessive latenance on reinforcement, bootom of footing needs to be cleaned.
|
BLD-Footing | 10/17/2006 | 10/18/2006 | 10/18/2006 | P | NR |
Mike Jordan
|
|
|
Interior footing 14.5, scheduled for 2pm pour.; Phone #: ###-#### Internet Inspection Request from: Brock Callister. wip.
|
BLD-Foundation | 10/16/2006 | 10/16/2006 | 10/16/2006 | P | PART |
Mike Jordan
|
|
|
Walls at elevator pit. Would like to pour walls at 2pm today.; Phone #: ###-#### Internet Inspection Request from: Brock Callister. All reinforcement tied, wip progress on form placement. Needs to clean out bottom of wall prior to placing outside wall form.
|
BLD-Foundation | 10/16/2006 | 10/17/2006 | 10/16/2006 | A | CANC |
Mike Jordan
|
|
|
Walls in elevator pit; Phone #: ###-#### Internet Inspection Request from: Brock Callister Inspection cancelled from web by: Brock Callister
|
BLD-Foundation | 10/11/2006 | 10/12/2006 | 10/12/2006 | A | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Brock Callister
|
BLD-Footing | 10/11/2006 | 10/12/2006 | 10/12/2006 | A | PART |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Brock Callister. Interior pad footings at grids B,C and G and elevator pit floor. Special insp. will be done on entire job. All reinforcement in place, Bottom of footings to be cleaned and fix minor clearance issues. Will verify thru special insp. report.
|
BLD-Conference | 9/14/2006 | 9/14/2006 | 9/14/2006 | P | DONE |
Mike Jordan
|
|
|
brock; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Reviewed plans with contractor.
|