Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD06-01827
StatusFinaled
Name HEART TO HEART
Site Address 10870 W FAIRVIEW AVE 102
Project NameFAIRVIEW BUSINESS PARK
Customer Number 
ePlanReviewNo
Description
(RCE-10348- Sage Construction) (HEART TO HEART - FAIRVIEW BUSINESS PARK BLDG A) To build out the center 2,000 sq.ft. of an existing 6,000 sq. ft. shell building (BLD05-01661) to create a first time tenant space for use as a retail sales and display of 1,922 sq. ft. for Heart to Heart Gifts. Work includes construction of two tenant perimeter walls to define the space, create two fully accessible restrooms; install suspended ceiling grid system with electrical & mechanical fixtures; install bi-level switches and upgrade electrical, plumbing & mechanical to meet tenant needs and comply with current adopted codes and ordinances; to remove or modify two existing exterior doors in north and south walls to be non-operational leaving two existing required exits in north and south walls; install service sink and water cooler; and install wall & floor finishes. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/16/200610/16/200610/17/2006PPASS
DetailsJim Sly
tim - note: call 1/2 prior to going out - as late as possible in the day ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
OK for Perm Occ. :)
Permanent Occupancy 10/16/200610/16/2006 DONE
Details
BLD-Final10/6/200610/6/200610/6/2006PCANC
DetailsJim Sly
tim - late afternoon - call prior ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
Canc by contr
FIRE-Final Inspection10/6/200610/6/200610/6/2006PPASS
DetailsTroy Cobbley
Fire life safety finaled. Structural inspector please verify the missing sticker at the main exit.
BLD-Framing/Rough-in9/28/20069/28/20069/28/2006PPASS
DetailsJim Storey
tim - ceiling; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
FIRE-Conference9/26/20069/27/20069/27/2006ADONE
DetailsTroy Cobbley
I went over egress lighting and exit sign locations with the contractor.
FIRE-Conference9/25/20069/26/20069/26/2006ADEFR
DetailsForrest France
Inspection rescheduled.
BLD-Framing/Rough-in9/7/20069/8/20069/8/2006APASS
DetailsJim Sly
tim ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
Frame and energy pass