Permanent Occupancy | | 11/16/2006 | 11/16/2006 | | DONE |
|
|
|
|
BLD-Final | 11/13/2006 | 11/13/2006 | 11/13/2006 | P | CANC |
Mike Jordan
|
|
|
Harold; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD-Final | 11/9/2006 | 11/9/2006 | 11/9/2006 | P | PASS |
Mike Jordan
|
|
|
harold; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Temp occ granted. Will bbe ok for perm occ once elec. finals and shell goes from temp to perm.
|
FIRE-Final Inspection | 11/8/2006 | 11/9/2006 | 11/9/2006 | A | PASS |
Forrest France
|
|
|
Fire life safety is satisfactory, inspection passed.
|
BLD-Framing/Rough-in | 10/27/2006 | 10/27/2006 | 10/27/2006 | P | PASS |
Mike Jordan
|
|
|
harold - note: ceiling grid ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith.. mech. shafts have been blocked.
|
BLD-Other | 10/20/2006 | 10/23/2006 | 10/23/2006 | A | PEND |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 10/20/2006 at 1:28:02 PM. Contact: ###-####. Other trades not yet insp. above ceiling grid. mech shaft not fireblocked.
|
BLD-Energy code compliance | 9/21/2006 | 9/22/2006 | 9/22/2006 | A | PASS |
Mike Jordan
|
|
|
harold; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Needs to fireblock mech chase at ceilings.
|
BLD-Framing/Rough-in | 9/20/2006 | 9/21/2006 | 9/21/2006 | A | PART |
Mike Jordan
|
|
|
harold; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Interior walls only.
|