Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD06-02180
StatusFinaled
Name JAYO CONSTRUCTION
Site Address 10588 W BUSINESSPARK LN
Project NameSouthwind Business Park-Bldg E
Customer Number 
ePlanReviewNo
Description
RCE 2103 Jayo Construction Inc (SILVER KEY INSURANCE - SOUTHWIND BUSINESS PARK BLDG E) To perform the first time build-out of a 1,784 sq.ft. shell space to create an office, all per approved plans, red-line notes thereon and all attached plan review conditions of all reviewing agencies. Work includes construction of interior walls to create five private offices, a conference room, break room, storage room, a reception / waiting area and two fully accessible restrooms; to upgrade electrical, mechanical & plumbing to meet tenant needs and comply with current adopted codes and ordinances; and complete interior finishes and cabinetry. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/24/20071/25/20071/25/2007APASS
DetailsMike Jordan
jeff; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Ok for perm occ. letter of compliance was issued for shell and core portion as well.
Permanent Occupancy 1/25/20071/25/2007 DONE
Details
BLD-Final12/27/200612/28/200612/28/2006APART
DetailsMike Jordan
jeff ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. ok for temp occ. Shell and core was inspected also and was given temp. TI will be ok for perm occ once shell goes perm. No sign off cards!!!
BLD-Final12/26/200612/27/200612/27/2006PFAIL
DetailsMike Jordan
jeff ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Needs to get elec. finaled.
FIRE-Final Inspection12/26/200612/27/200612/27/2006APASS
DetailsTroy Cobbley
Life safety finaled
FIRE-Final Inspection12/22/200612/26/200612/26/2006AFAIL
DetailsForrest France
The sample tube for the duct detector is not approved, provide the correct length tube and means for testing at next inspection, remaining life safety issues are okay.
FIRE-Final Inspection12/22/200612/22/200612/22/2006PCANC
DetailsTroy Cobbley
Per Jeff he wants to reschedule for next week.
FIRE-Final Inspection12/20/200612/21/200612/21/2006PFAIL
DetailsTroy Cobbley
Lower fire extinguishers, provide the correct remote annunciator for the duct smoke detector and the correct sample tube.
BLD-Conference11/7/200611/7/200611/7/2006PPASS
DetailsMike Jordan
jeff ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. framing at 1hr ceiling. ok for 2nd layer. exterior 1hr wall interior side ok.
BLD-Energy code compliance11/6/200611/6/200611/6/2006PPASS
DetailsMike Jordan
jeff ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. All framing issues have been resoloved.
BLD-Energy code compliance11/3/200611/6/200611/6/2006ANH
DetailsMike Jordan
jeff; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Shaft is being repaired, firecaulking not complete.
BLD-Conference11/2/200611/3/200611/3/2006APART
DetailsMike Jordan
jeff ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Still needs to complete firew caulking build shaft correctly, and box out ele. panel. All other issues have been resolved. ok to insul. Contractor to repair and call back for insp.
BLD-Framing/Rough-in11/2/200611/2/200611/2/2006PNR
DetailsMike Jordan
jeff ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Framing/Rough-in11/1/200611/1/200611/1/2006PFAIL
DetailsMike Jordan
jeff; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Needs to remove roof vents next to property line wall. complete all fire caulking. double layer can lights. c/n posted
BLD-Framing/Rough-in10/27/200610/30/200610/30/2006ANR
DetailsMike Jordan
kameron; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Mech ri insp failed. Elec permit for this TI is attached to shell permit.