BLD-Final | 10/25/2006 | 10/26/2006 | 10/26/2006 | A | PART |
Jim Storey
|
|
|
roger; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
DOC - Permit Finaled | 10/26/2006 | 10/26/2006 | 10/26/2006 | P | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 9/8/2006 | 9/8/2006 | 9/8/2006 | P | PASS |
Tony Young
|
|
|
roger; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Framing/Rough-in | 8/23/2006 | 8/24/2006 | 8/24/2006 | A | PART |
Dave Hannah
|
|
|
roger; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt looked at beams and post framing along with briggs engineering all struct changes and framing ok engineering dated 8/23
|
BLD-Conference | 8/4/2006 | 8/7/2006 | 8/7/2006 | A | PASS |
Tony Young
|
|
|
carma - Note: Contractor will be there about 9:00 am; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles general ?s,, built different than thought,, engineer to approve modifications or redesign
|