Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD06-02361
StatusFinaled
Name ROTH CONSTRUCTION INC
Site Address 4466 N MACKENZIE LN
Project Name 
Customer Number 
ePlanReviewNo
Description
(Roth Construction RCE-2486) MODIFIED EXISTING BUILDING PERMIT ON 10-20-06 TO INCLUDE: To construct a 2003sq.ft. Two story single family dwelling (1487sq.ft. Main level / 516sq.ft. Upper level) with a 84sq.ft. Covered front courtyard, and a 461sq.ft. Attached garage per approved plans, all red-lining, and Plan review report. THE PERMIT HOLDER is responsible to comply with current wall bracing requirements adopted by the city of Boise. Planning and Zoning approval as per Cody Riddle with Planning and Zoning dated 10/19/06. "CONTRACTOR ROTH CONSTRUCTION INC NUMBER RCE-2486" To construct a 2675sq.ft. Two story single family dwelling (1215sq.ft. Main level / 1460sq.ft. Upper level) with a 529sq.ft. Attached garage per approved plans, all red-lining, and Plan review report. THE PERMIT HOLDER is responsible to comply with current wall bracing requirements adopted by the city of Boise. R-2D Zoning district, building setbacks, and CUP02-00099 per Carl Miller with Planning and Zoning. (SRZ)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/16/20074/17/20074/17/2007APASS
DetailsJim Sly
garage code 2007 Phone #: ###-#### Internet Inspection Request from: Erby Gonzales
C/C issued
DOC - Permit Finaled4/17/20074/17/20074/17/2007PPASS
DetailsJim Sly
BLD-Energy code compliance1/15/20071/19/20071/19/2007APASS
DetailsJim Sly
Phone #: ###-####
BLD-Framing/Rough-in1/15/20071/16/20071/16/2007PPASS
DetailsJim Sly
plans above fireplace Phone #: ###-####
BLD-Foundation11/8/200611/13/200611/13/2006PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 11/8/2006 at 6:25:07 PM. Contact: ###-####.
BLD-Footing11/8/200611/9/200611/9/2006PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 11/8/2006 at 6:22:52 PM. Contact: ###-####.
poured
BLD-Foundation11/7/200611/9/200611/9/2006PNR
DetailsTony Young
Scheduled by a contractor via Hello! on 11/7/2006 at 3:50:05 PM. Contact: ###-####.
BLD-Footing11/7/200611/8/200611/8/2006PCANC
DetailsTony Young
Scheduled by a contractor via Hello! on 11/7/2006 at 3:49:19 PM. Contact: ###-####.