BLD-Framing/Rough-in | 1/26/2007 | 1/26/2007 | 1/26/2007 | P | PASS |
Jim Sly
|
|
|
tucker; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 10/5/2006 | 10/6/2006 | 10/6/2006 | A | NR |
Jim Storey
|
|
|
paul; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok to side building.
|
BLD-Framing/Rough-in | 9/29/2006 | 10/2/2006 | 10/2/2006 | A | NR |
Tony Young
|
|
|
paul - call prior to insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley need trades 1st
|
BLD-Foundation | 8/28/2006 | 8/28/2006 | 8/28/2006 | P | PART |
Tony Young
|
|
|
gustavo - early afternoon - concrete pour around 1 pm; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley wip,, need letter from engineer approving as built,,rebar was not epoxied yet
|