Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD06-02671
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 10136 S FEDERAL WAY
Project NameMICRON NANOFAB
Customer NumberC9793
ePlanReviewNo
Description
(Micron Nanofab - Footings, Foundation and underground utilities permit) This phased permit is for the construction of a portion of the footings and foundation for the new Micron Nanofab buiding project, approximately 29,000 square feet. This permit also includes the underground utilities for this new building. This permit does not include the construction of the footings and foundation for the two pre-engineered metal building sections. There is no foundation work approved east of grid line D and that portion that is west of grid line K and south of grid line 6.5. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled11/30/200711/30/200711/30/2007PPASS
DetailsJim Storey
l/c isued.
BLD-Final10/24/200710/24/200710/24/2007AFAIL
DetailsJim Storey
bryan Phone #: ###-#### c/n isued list w/brian
BLD-Final10/22/200710/23/200710/24/2007PCANC
DetailsJim Storey
bryan Phone #: ###-#### rolled to wed
BLD-Final10/19/200710/22/200710/22/2007PCANC
DetailsJim Storey
bryan Phone #: ###-#### rolled to pm tue
BLD-Final10/1/200710/2/200710/2/2007APART
DetailsJim Storey
bryan - partial Phone #: ###-####
BLD-Framing/Rough-in8/30/20078/30/20078/30/2007PNR
DetailsJim Storey
Ryan; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Framing/Rough-in8/28/20078/29/20078/30/2007ANR
DetailsJim Storey
Ryan; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Framing/Rough-in8/20/20078/21/20078/21/2007PPART
DetailsJim Storey
Brian; Phone #: ###-#### Internet Inspection Request from: Hattie James
BLD-Framing/Rough-in8/6/20078/7/20078/7/2007APASS
DetailsJim Storey
brian Phone #: ###-#### office ceilling/ vestabule ceilling framing
BLD-Framing/Rough-in7/31/20078/1/20078/1/2007AFAIL
DetailsJim Storey
brian; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang c/n isued
BLD-Framing/Rough-in7/27/20077/30/20077/30/2007ANR
DetailsJim Storey
ryan; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang fire stopping/ floor systiem at elavator/ riser height/exit path door encrochment or path.
BLD-Framing/Rough-in7/3/20077/5/20077/5/2007AFAIL
DetailsJim Storey
brian; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang remove wood from walls/fire stopping not per listing/ box elavator shaft/ ele box over sized in stair wells.
BLD-Conference6/25/20076/27/20076/27/2007PPART
DetailsJim Storey
PAUL Phone #: ###-#### meetting for fire stopping requirments of rated const./ need to get mech insp. started/ shaft wrap listing
BLD-Framing/Rough-in6/20/20076/21/20076/21/2007APART
DetailsJim Storey
bryan Phone #: ###-#### fire stopping listings
BLD-Framing/Rough-in5/24/20075/25/20075/25/2007APART
DetailsJim Storey
bryan ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith mfl pannels ok in all but 2 locations for inside and outside conections/ fire stopping listings required to be provided
BLD-Framing/Rough-in5/18/20075/21/20075/21/2007APASS
DetailsJim Storey
paul; Phone #: ###-#### Internet Inspection Request from: Victoria Beall shaft wall rebuilt ok for cover/ base lid in progess ok to proceed.
BLD-Framing/Rough-in5/16/20075/17/20075/17/2007APASS
DetailsJim Storey
paul turley; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles mst panels ok for cover south side of bldg.
BLD-Framing/Rough-in5/14/20075/14/20075/14/2007PPART
DetailsJim Storey
bryan; Phone #: ###-#### Internet Inspection Request from: Victoria Beall dock area msc pannels ok/ list w brian on shaft/ boiller rm.
BLD-Framing/Rough-in5/8/20075/9/20075/9/2007AFAIL
DetailsJim Storey
paul; Phone #: ###-#### Internet Inspection Request from: Victoria Beall need to recall achor bolts/
BLD-Framing/Rough-in4/20/20074/23/20074/23/2007APART
DetailsJim Storey
brian; Phone #: ###-#### Internet Inspection Request from: Victoria Beall need to reinsp 1/2 sw bolt and m bolt conections of csp walls.
BLD-Framing/Rough-in4/18/20074/19/20074/19/2007ACANC
DetailsJim Storey
brian; Phone #: ###-#### Internet Inspection Request from: Victoria Beall 1st floor north of fab ok to cover parall ele aprovals
BLD-Framing/Rough-in3/26/20073/27/20073/28/2007APASS
DetailsJim Storey
bryan ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith basement chem rm areas ok to cover.
BLD-Framing/Rough-in3/19/20073/20/20073/20/2007APART
DetailsJim Storey
ryan; Phone #: ###-#### Internet Inspection Request from: Victoria Beallwip
BLD-Foundation3/9/20073/15/20073/15/2007APASS
DetailsJim Storey
brian murphy; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Foundation3/9/20073/13/20073/13/2007APART
DetailsJim Storey
brian murphy; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Foundation3/5/20073/8/20073/8/2007APART
DetailsJim Storey
brian ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Foundation3/5/20073/6/20073/6/2007APART
DetailsJim Storey
brian ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith review of progess/ roof deck review/ hpm rooms
BLD-Foundation12/26/200612/29/200612/29/2006PPART
DetailsJim Storey
Brian; Phone #: ###-#### Internet Inspection Request from: Sherri Bennettwipwsi
BLD-Foundation12/26/200612/28/200612/28/2006PPART
DetailsJim Storey
Brian; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett
BLD-Foundation12/26/200612/27/200612/27/2006PPASS
DetailsJim Storey
Brian; Phone #: ###-#### Internet Inspection Request from: Sherri Bennettwip
BLD-Foundation12/26/200612/26/200612/27/2006PPASS
DetailsJim Storey
Brian; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett
BLD-Foundation12/5/200612/8/200612/8/2006APASS
DetailsJim Storey
brian ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith pwsi/wip
BLD-Foundation12/5/200612/7/200612/8/2006APART
DetailsJim Storey
brian ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Foundation12/5/200612/6/200612/6/2006APART
DetailsJim Storey
brian ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith wip psir.
BLD-Foundation12/5/200612/5/200612/5/2006PPART
DetailsJim Storey
brian ; Phone #: ###-#### Internet Inspection Request from: Patricia Smithwip/psir
BLD-Foundation11/27/200612/1/200612/1/2006APART
DetailsJim Storey
bryan ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith wip si reports
BLD-Foundation11/27/200611/30/200611/30/2006APART
DetailsJim Storey
bryan ; Phone #: ###-#### Internet Inspection Request from: Patricia Smi wip
BLD-Foundation11/27/200611/29/200611/29/2006APASS
DetailsJim Storey
bryan ; Phone #: ###-#### Internet Inspection Request from: Patricia Smithcold weather aic pratcies in place.
BLD-Foundation11/27/200611/28/200611/28/2006APART
DetailsJim Storey
bryan ; Phone #: ###-#### Internet Inspection Request from: Patricia Smithplaced with si avrage temp below frezing pending report.
BLD-Foundation11/27/200611/27/200611/27/2006PPART
DetailsJim Storey
bryan ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith placed with si pending report.
BLD-Foundation11/21/200611/22/200611/22/2006APASS
DetailsJim Storey
brian ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Foundation11/14/200611/15/200611/15/2006APART
DetailsJim Storey
ryan ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith retaining wall ft s/w corner rebar ok pending si reports .
BLD-Foundation11/9/200611/9/200611/9/2006PPART
DetailsJim Storey
bryan ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok s/i pending concrete report.
BLD-Foundation11/1/200611/2/200611/2/2006APART
DetailsJim Storey
john ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie basment rebar h-d/9-6.5 ok per plan pending si reports.