Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-02741
StatusFinaled
Name T W CLARK CONSTRUCTION
Site Address 9465 W EMERALD ST
Project NameVideo Eye Bldg
Customer Number 
ePlanReviewNo
Description
STARBUCKS COFFEE CO. OFFICE T.I. - To finish a 2,650 square foot office tenant space for occupany by the Starbucks Coffee Co. This office tenant space will include open office space, conference room, storage room, electrical room, break room, classroom and entry hallway. The Starbucks tenant space will be located in the northeast corner of the first floor of the Video Eye building. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/30/20082/4/20082/4/2008PPASS
DetailsMike Jordan
tim - please call 1/2 hr prior to inspection Phone #: ###-####. ok for perm occ.
FIRE-Final Inspection1/30/20082/4/20082/4/2008APASS
DetailsTroy Cobbley
Life safety passed.
BLD-Final1/11/20081/14/20081/14/2008ANR
DetailsMike Jordan
Tim; Phone #: ###-####, please call 30 minutes prior Internet Inspection Request from: Cathy Weisshaupt. Needs life/safety first. Left message.
BLD-Final1/16/20071/17/20071/18/2007PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/16/2007 at 5:44:34 PM. Contact: ###-####. ok for temp occ. waiting for additional exit door and hardware.
BLD-Final1/16/20071/17/20071/17/2007ACANC
DetailsMike Jordan
BLD-Final1/16/20071/16/20071/16/2007PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/16/2007 at 10:52:14 AM. Contact: ###-####. Needs mech final.
BLD-Final1/15/20071/16/20071/16/2007ANR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/15/2007 at 8:37:39 AM. Contact: ###-####. Needs mech final.
FIRE-Final Inspection1/11/20071/12/20071/12/2007PPART
DetailsTroy Cobbley
A temporary occupancy was given with dave hannimans permission until the door from the conference room has been installed with approved hardware and the thumbturn is removed from the main exit.
BLD-Other1/4/20071/4/20071/4/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/4/2007 at 7:10:38 AM. Contact: ###-####. Grid ok.
BLD-Other1/2/20071/2/20071/2/2007PFAIL
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/2/2007 at 8:09:36 AM. Contact: ###-####. Ceiling grid not installed as per approved plan. Also needs other ri insp. above grid.
BLD-Framing/Rough-in12/4/200612/5/200612/5/2006APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 12/4/2006 at 3:43:34 PM. Contact: ###-####. Interior steel stud walls. Needs to fireblock top of mech. chases. Will verify at grid insp.
BLD-Framing/Rough-in12/1/200612/4/200612/4/2006ANR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 12/1/2006 at 11:17:29 AM. Contact: ###-####. No access, all doors were locked when on site.