BLD-Final | 1/30/2008 | 2/4/2008 | 2/4/2008 | P | PASS |
Mike Jordan
|
|
|
tim - please call 1/2 hr prior to inspection Phone #: ###-####. ok for perm occ.
|
FIRE-Final Inspection | 1/30/2008 | 2/4/2008 | 2/4/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Final | 1/11/2008 | 1/14/2008 | 1/14/2008 | A | NR |
Mike Jordan
|
|
|
Tim; Phone #: ###-####, please call 30 minutes prior Internet Inspection Request from: Cathy Weisshaupt. Needs life/safety first. Left message.
|
BLD-Final | 1/16/2007 | 1/17/2007 | 1/18/2007 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 1/16/2007 at 5:44:34 PM. Contact: ###-####. ok for temp occ. waiting for additional exit door and hardware.
|
BLD-Final | 1/16/2007 | 1/17/2007 | 1/17/2007 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Final | 1/16/2007 | 1/16/2007 | 1/16/2007 | P | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 1/16/2007 at 10:52:14 AM. Contact: ###-####. Needs mech final.
|
BLD-Final | 1/15/2007 | 1/16/2007 | 1/16/2007 | A | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 1/15/2007 at 8:37:39 AM. Contact: ###-####. Needs mech final.
|
FIRE-Final Inspection | 1/11/2007 | 1/12/2007 | 1/12/2007 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with dave hannimans permission until the door from the conference room has been installed with approved hardware and the thumbturn is removed from the main exit.
|
BLD-Other | 1/4/2007 | 1/4/2007 | 1/4/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 1/4/2007 at 7:10:38 AM. Contact: ###-####. Grid ok.
|
BLD-Other | 1/2/2007 | 1/2/2007 | 1/2/2007 | P | FAIL |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 1/2/2007 at 8:09:36 AM. Contact: ###-####. Ceiling grid not installed as per approved plan. Also needs other ri insp. above grid.
|
BLD-Framing/Rough-in | 12/4/2006 | 12/5/2006 | 12/5/2006 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 12/4/2006 at 3:43:34 PM. Contact: ###-####. Interior steel stud walls. Needs to fireblock top of mech. chases. Will verify at grid insp.
|
BLD-Framing/Rough-in | 12/1/2006 | 12/4/2006 | 12/4/2006 | A | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 12/1/2006 at 11:17:29 AM. Contact: ###-####. No access, all doors were locked when on site.
|