BLD-Final | 6/22/2009 | 6/22/2009 | 6/22/2009 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Phil Doble ok for perm occ
|
FIRE-Final Inspection | 6/11/2009 | 6/11/2009 | 6/11/2009 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection passed after corrections made while on site.
|
FIRE-Conference | 6/10/2009 | 6/10/2009 | 6/10/2009 | A | DONE |
Forrest France
|
|
|
FIR07-00086 Phone #: ###-#### Internet Inspection Request from: Phil Doble
|
BLD-Wall cover | 5/6/2009 | 5/6/2009 | 5/6/2009 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Phil Doble ceiling grid ok to cover
|
BLD-Wall cover | 4/23/2009 | 4/23/2009 | 4/24/2009 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Phil Doble ok to cover walls in back
|
BLD-Conference | 7/21/2008 | 7/22/2008 | 7/22/2008 | A | PART |
Dave Hannah
|
|
|
This is for the two hr. duct wrap Phone #: ###-#### Internet Inspection Request from: Phil Doble ok to cover this is the part from the stair tower ceiling to the roof
|
BLD-Conference | 7/15/2008 | 7/15/2008 | 7/15/2008 | A | PASS |
Dave Hannah
|
|
|
###-#### just incase Phone #: ###-#### Internet Inspection Request from: Phil Doble duct work in stair tower 2hr fire rap as per plan reveiw
|
BLD-Wall cover | 5/28/2008 | 5/28/2008 | 5/28/2008 | A | PART |
Dave Hannah
|
|
|
###-#### Phone #: ###-#### Internet Inspection Request from: Phil Doble ok to cover ceilings
|
BLD-Wall cover | 5/27/2008 | 5/27/2008 | 5/27/2008 | A | NH |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Phil Doble Called Phil 3 times .....went by jobsite...dont know where to go....left mssg for Phil..."reschedule for PM and to call me"........
|
BLD-Conference | 5/20/2008 | 5/21/2008 | 5/21/2008 | A | PART |
Dave Hannah
|
|
|
THIS IS THE PERMIT WITH THE DUCTWORK INSTALLED IN THE 2HR STAIRWELL I CALLED YOU ABOUT. PLEASE CALL ME AND CANCEL THE OTHER PERMIT THAT WAS SENT TO YOU..THANKS DIXIE
|
BLD-Framing/Rough-in | 5/12/2008 | 5/12/2008 | 5/12/2008 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Phil Doble ok to cover walls
|
BLD-Wall cover | 3/3/2008 | 3/3/2008 | 3/3/2008 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Phil Doble ok to cover ceiling and drug fab area
|
BLD-Wall cover | 1/3/2008 | 1/4/2008 | 1/5/2008 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Phil Doble ok to cover walls
|
BLD-Final | 8/30/2007 | 8/30/2007 | 8/30/2007 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Phil Doble ok to move into this phase after fire oks
|
BLD-Framing/Rough-in | 8/13/2007 | 8/13/2007 | 8/13/2007 | A | PART |
Dave Hannah
|
|
|
ceiling cover Phone #: ###-#### Internet Inspection Request from: Phil Doble
|
BLD-Conference | 7/31/2007 | 8/1/2007 | 8/1/2007 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Phil Doble
|
BLD-Framing/Rough-in | 6/27/2007 | 6/27/2007 | 6/27/2007 | A | PART |
Dave Hannah
|
|
|
any time but 11:00 to 11:30 am. Phone #: ###-#### Internet Inspection Request from: Phil Doble ok to cover wall first phase
|
BLD-Final | 3/9/2007 | 3/9/2007 | 3/9/2007 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-#### ok to occ three offices and temp locker room
|
BLD-Wall cover | 3/1/2007 | 3/1/2007 | 3/1/2007 | A | CANC |
Dave Hannah
|
|
|
Phone #: ###-#### ok to cover ceilings in office areas first phase
|
BLD-Wall cover | 1/22/2007 | 1/22/2007 | 1/22/2007 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-#### phase b walls ok to cover
|