Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD06-02787
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project Name 
Customer NumberC9389
ePlanReviewNo
Description
Micron building #4 - (C9389) - Remodel Rooms #103 and #106 for Chemistry Lab - To construct a new 12.75'x32' (408 sq. ft.) 6" reinforced concrete slab and retaining wall for a new air handler unit. This slab and air handler will be located at the west exterior of the building. To demolish and remove all interior partitions and equipment at Analytical Chem. Lab #103A and Organic Chem. Lab #106A. To constuct two-hour fire-barrier walls floors and ceilings at Analytical Chem. Lab #103A. Analytical Chem. Lab 103A is being converted from an F-1 occupancy to an H-2 occupancy. The fire barriers are required as occupancy separation from the remainder of the building. To add a 4070 door at #103A and #106A. Analytical Chem. Lab #103A will now be 980 square feet in area and Organic Chem. Lab #106A will be 480 square feet. This work is being done on the first floor of Building #4, between grid lines A&B and 2&5. This building is at maximum allowable area and no additional H-2 or H-3 Occupancies will be allowed in this building. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/4/20074/11/20074/11/2007APASS
DetailsJim Storey
Phone #: ###-####
DOC - Permit Finaled4/11/20074/11/20074/11/2007PPASS
DetailsJim Storey
FIRE-Final Inspection4/4/20074/10/20074/10/2007APASS
DetailsForrest France
Fire life safety inspection passed.
BLD-Other4/4/20074/5/20074/5/2007APASS
DetailsJim Storey
look at ceiling grid in 103 before final Phone #: ###-####
FIRE-Alarm Testing3/30/20074/2/20074/3/2007PPART
DetailsForrest France
Room 106 is acceptable for occupancy, permit final pending completion of the remainder of the scope of work.
BLD-Final3/27/20074/2/20074/2/2007APART
DetailsJim Storey
Jim, this is the partial for rm 106, B4 Phone #: ###-#### temp ok on this rm.
BLD-Final3/15/20073/22/20073/22/2007ANR
DetailsJim Storey
would like to final room 106A, B4, for partial occupancy. Phone #: ###-#### walked both locations fire prooffing compliant.
BLD-Conference12/27/200612/28/200612/28/2006APART
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Rob Puckett pending resolve.
BLD-Conference12/1/200612/4/200612/5/2006ADEFR
DetailsJim Storey
###-#### - rob
BLD-Conference11/20/200611/21/200611/21/2006APART
DetailsJim Storey
###-#### - rob
BLD-Conference11/6/200611/7/200611/7/2006APART
DetailsJim Storey
rob - ###-#### reviewed demo/ had isue as to fireprooffing to bearing support of primary beams.