Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-02821
StatusExpired
Name BOISE CITY BUILDING COMPANY
Site Address 2203 -2205 S AMY AVE
Project Name2203 & 2205 S Amy
Customer Number 
ePlanReviewNo
Description
"CONTRACTOR DAVID HALE REGISTRATION NUMBER RCE-527" To construct a 3032sq.ft. Two story Duplex. Each Unit to include: Three Bedrooms, Two and a half Bathrooms, 1516sq.ft. (652sq.ft. Main floor / 864sq.ft. Upper floor), 93sq.ft. Covered front porch, and a 417sq.ft. Attached garage per approved plans, all red-lining, and Plan Review report. THE CONSTRUCTION OF THE DWELLING UNIT SEPARATION WALL IS DESIGNED TO MEET TOWNHOUSE CONSTRUCTION. NOTE: conversion permits and either a recorded subdivision or a zoning certificate and recorded record of survey must be completed prior to selling as individual units. R-2D zoning district, building setbacks, and DRH06-00341 per Gregory M. Johnson with Planning and Zoning. (SRZ)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Energy code compliance12/14/200612/14/200612/14/2006PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/13/2006 at 12:53:56 PM. Contact: ###-####.
BLD-Energy code compliance12/13/200612/14/200612/14/2006ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/13/2006 at 12:53:56 PM. Contact: ###-####.
BLD-Framing/Rough-in12/11/200612/12/200612/12/2006APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/11/2006 at 3:14:02 PM. Contact: ###-####.2nd floor overbuild fire wall not complet. ok to insulate if ele is signed off no sticker to be found.
BLD-Framing/Rough-in12/11/200612/11/200612/11/2006PNR
DetailsMike Jordan
andy ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith>no approved plans or truss engineering on site.
BLD-Conference11/13/200611/13/200611/13/2006PPASS
DetailsJim Storey
andy ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Conference11/9/200611/9/200611/9/2006PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/9/2006 at 9:15:30 AM. Contact: ###-####.24/8 nailling pattern per listing.
BLD-Foundation11/2/200611/2/200611/2/2006PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/2/2006 at 7:27:03 AM. Contact: ###-####.
BLD-Footing11/1/200611/2/200611/2/2006AFAIL
DetailsMike Jordan
Scheduled by a contractor via Hello! on 10/31/2006 at 8:40:22 PM. Contact: ###-####. Conc placed already when on site. No approved plans on site, no lot lines strung. c/n posted.
BLD-Footing10/31/200611/1/200611/1/2006PDEFR
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/31/2006 at 8:40:22 PM. Contact: ###-####. out of time.
BLD-Footing10/31/200611/1/200611/1/2006ACANC
DetailsJim Storey
BLD-Footing10/30/200610/31/200610/31/2006PNR
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/30/2006 at 9:28:30 PM. Contact: ###-####.no plans on site.