BLD-Final | 5/1/2007 | 5/2/2007 | 5/2/2007 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 5/1/2007 at 3:56:16 PM. Contact: ###-####. Ok for perm occ. Recieved final aff. letter from special insp. agency.
|
BLD-Final | 4/30/2007 | 5/1/2007 | 5/1/2007 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/30/2007 at 2:39:12 PM. Contact: ###-####. ok for temp occ. Need final aff. letter from special insp. agency.
|
Code Occupancy Approval | 5/1/2007 | 5/1/2007 | 5/1/2007 | P | PASS |
Scott M.Brown
|
|
|
all in final signed
|
Permanent Occupancy | | 5/1/2007 | 5/1/2007 | | DONE |
|
|
|
|
FIRE-Final Inspection | 4/30/2007 | 4/30/2007 | 4/30/2007 | A | PASS |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 4/30/2007 at 6:58:33 AM. Contact: ###-####.
|
FIRE-Final Inspection | 4/26/2007 | 4/27/2007 | 4/27/2007 | P | FAIL |
Troy Cobbley
|
|
|
Exit lights and emergency lights do not work.
|
FIRE-Final Inspection | 4/25/2007 | 4/26/2007 | 4/26/2007 | A | FAIL |
Troy Cobbley
|
|
|
Need fire lane signage as discussed, remaining door hardware installed, test exit signs and emergency lights and either install duct detectors correctly with remote annunciators or remove since the units are less than 2,000cfm and do not share a common duct or return plenum
|
BLD-Other | 4/6/2007 | 4/9/2007 | 4/9/2007 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/6/2007 at 3:05:41 PM. Contact: ###-####. Grid OK
|
BLD-Other | 4/4/2007 | 4/5/2007 | 4/5/2007 | A | FAIL |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/4/2007 at 12:32:55 PM. Contact: ###-####. Needs elec. ri insp. above grid. Needs to add wires to can lights and diffusers. Still needs to install draftstop.
|
BLD-Energy code compliance | 3/5/2007 | 3/6/2007 | 3/6/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/5/2007 at 9:50:26 AM. Contact: ###-####. insul. is complete. ok to cover.
|
BLD-Energy code compliance | 3/2/2007 | 3/5/2007 | 3/5/2007 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/2/2007 at 9:00:56 AM. Contact: ###-####. Needs to install draftstop and continue insul. to bottom of deck on perimeter walls.
|
BLD-Framing/Rough-in | 2/28/2007 | 3/1/2007 | 3/1/2007 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/28/2007 at 2:55:14 PM. Contact: ###-####.
|
BLD-Foundation | 12/28/2006 | 1/2/2007 | 1/2/2007 | A | PART |
Mike Jordan
|
|
|
dan - stem wall ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. wip. perimeter stemwalls.
|
BLD-Footing | 12/28/2006 | 12/29/2006 | 12/29/2006 | P | PART |
Mike Jordan
|
|
|
dan ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Perimeter and interior column pad footings. wip, Needs to finish installing verts. Job wil have special insp.
|