Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-02881
StatusFinaled
Name DUANE HUFFMAN
Site Address 9271 W TEAKWOOD DR
Project Name 
Customer Number 
ePlanReviewNo
Description
(NO CONTRACTOR REGISTRATION PROVIDED. APPLICANT CERTIFIES EXEMPTION PER IDAHO STATUE 54-5205) *** This project is for the addition of 1962s.f. to an existing 2000s.f. split level single family dwelling. "The permit holder is responsible to comply with current wall bracing requirements as adopted by Boise City." There is to be 2-bedrooms and bathrom on the main level addition; a 400s.f. garage addition and approx 600s.f. family room over the existing 600s.f. garage. Separate electrical, plumbing, mechanical and ESC permits are required. R-1A ok per Sue Hansen. All per the approved plans as marked REScheck and plan review notes. pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/13/20078/13/20078/13/2007PPASS
DetailsMike Jordan
duane Note: please give a call 1 hr prior to inspection Phone #: ###-####. All issues resolved.
DOC - Permit Finaled8/13/20078/13/20078/13/2007PPASS
DetailsMike Jordan
BLD-Final7/18/20077/18/20077/18/2007PFAIL
DetailsMike Jordan
duane - please call 1 hr prior to inspection Phone #: ###-####. Install smoke alarms as shown on approved plan. Install code compliant handrails on all new stairways.
BLD-Final7/13/20077/13/20077/13/2007PNR
DetailsMike Jordan
duane - please call 1 hr prior to inspection Phone #: ###-####. Needs elec. final first.
BLD-Energy code compliance4/4/20074/5/20074/5/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/4/2007 at 1:24:48 PM. Contact: ###-####. ok to cover.
BLD-Energy code compliance3/29/20073/30/20073/30/2007PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/29/2007 at 2:55:06 PM. Contact: ###-####. FRAMING INSP. All framing issues have been repaired. will call back for energy code when complete.
BLD-Framing/Rough-in3/26/20073/27/20073/27/2007AFAIL
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/26/2007 at 1:56:44 PM. Contact: ###-####. Landing at stairs not 36 inches. fireblock mech. chase upstairs. complete airseal package. Add studs under 2ply trusses upstairs. Swing door in upstairs or provide landing. Strap top plates above elec. boxes, 2 places. L brace gable ends. Check with joist manufacture regarding header connection supporting stairs to floor joist. Provide anchorage on bearing wall in garage and attach plywood. c/n posted. ok to insul.
BLD-Conference2/12/20072/13/20072/13/2007ADONE
DetailsMike Jordan
dwayne; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Wants to complete bonus room first. Noted to contractor to complete ri and ri insp at bonus room and then a partial framing insp. could be conducted.
BLD-Conference12/27/200612/27/200612/27/2006PPASS
DetailsMike Jordan
duane; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Conference11/27/200611/28/200611/28/2006ADONE
DetailsMike Jordan
duane; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Footing11/16/200611/17/200611/17/2006PPART
DetailsTony Young
matt; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
poured,, ok