Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-02950
StatusFinaled
Name SAGE CONSTRUCTION
Site Address 11875 W PRESIDENT DR
Project NameTreasure Valley Coffee
Customer Number 
ePlanReviewNo
Description
(Treasure Valley Coffee - Warehouse Addition) 9/12/07 - Plan Mod - Engineering has been provided for the north 31' of the east and west walls of space 105 of the original approved plans which was added to the overall tenant space under the 6/7/07 Plan Modifications. The north wall of space 105 was engineered as a bearing wall with footing size change, additional rebar and hold downs. The stud framing for all three wall portions was changed double 600S162-54, back to back steel studs at 48" o.c. with an intermediate 600S162-54 metal stud at 24" intermediate spacing between double studs with a minimum 12 gauge track. These walls also serve a shear walls with 5/8" GWB both side with #6 flathead self-tapping screws at 4" o.c. at edges and field. Additional columns, concrete pads, rebar and hairpin anchors where added as part of original foundation at the perimeter wall. Engineering indicates the walls were designed to carry a future storage mezzanine load of 125 PSF LL and 60 PSF DL. Separate application, plans, engineering design and calcualations for review and permit are required before any mezzanine can be constructed. 6/7/07 - PLAN MODIFICATION. ROOM 105A OF 2,720 SQ. FT. HAS BEEN ADDED TO THE FUTURE USABLE AREA OF TREASURE VALLEY COFFEE WAREHOUSE #101 & #102, FOR USE BY THEIR DELIVERY TRUCK DRIVERS, VENDING SERVICE. THERE WILL BE A NEW 3' DOOR ADDED BETWEEN ROOM 105A AND WAREHOUSE 102. CHANGE WILL ADD APPROXIMATELY 58' OF INTERIOR WALLS IN 105A TO CREATE THE FRONT OFFICE AREA, SUPPLY STORAGE AND SEPARATING VENDING SERVICE AREA. ACCESSIBLE RESTROOMS WILL NOT CHANGE AS A RESULT OF THIS MODIFICATION. THE INCREASED OCCUPANT LOAD FOR ADDITIONAL OFFICE AREA OF 105A INCREASE FROM 3 TO 9 AND 'F2 OCCUPANT LOAD REDUCES BY 3 FROM THE ORIGINAL PLAN REVIEW. THE ORIGINAL OVERHEAD DOOR LOCATION IN THE SE CORNER WILL BE FRAMED FOR A NEW 4' X 12' OFFICE WINDOW AND A LARGER 4' X 8' WINDOW WILL BE ADDED IN PLACE OF ORIGINAL 4' X 4' WINDOW. THERE IS NO OCCUPANCY ALLOWED FOR FUTURE 'VANILLA SPACE', #104, UNDER THIS PERMIT SCOPE. TENANT SPACE #105 BECAME PART OF TREASURE VALLEY COFFEE TENANT AREA UNDER THIS PLAN MODIFICATION, TO BE INCLUDED IN THE CERTIFICATE OF OCCUPANCY. ALL OTHER ITEMS REMAIN AS PER ORIGINAL APPROVED PLANS BY MIKE OTTO. drs To construct a 30,000 sq. ft. one story Type IIB fully fire sprinkled warehouse addition with a 6,000 sq. ft. mezzanine to the south side of the existing building #2. Work includes a remodel of the existing covered storage area of building #2 ,a three hour fire wall on the south side of building #2 between the new addition, vanilla finish for one separate 2800 tenant space in the new addition, all site improvements, paving and landscaping per approved plans and attachments, DRH06-00208. Fire sprinklers used for area. Storage racks greater than 8 feet in height require separate permits, plans and engineering. Separate plans and permits are required to occupy the new tenant space 104 in building #3. Letter of completion only for lease space 104 under this permit, no occupancy authorized. Occupied space for new building is for 32,644 sq. ft. (NOTE: SEE COMMENTS REGARDING ISSUANCE OF CERTIFICATE OF OCCUPANCY.)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/4/200712/5/200712/5/2007APASS
DetailsMike Jordan
tim Phone #: ###-####. Ok for perm occ. Letter of compliance was issued for space#104. Cathy, plm07-01301 should be a stand alone permit and not attached to this bld permit. This work is being done in the existing portion of the bldg. I contacted Lee Rice and left him ameesage to have this changed.
BLD-Final11/30/200712/3/200712/3/2007ANR
DetailsMike Jordan
tim Note: please call 1/2 hr prior to inspections Phone #: ###-####
BLD-Final11/7/200711/7/200711/7/2007PPART
DetailsMike Jordan
tim Note: call before inspection (not be available between 2-3) Phone #: ###-####. Temp occ granted. All isues resolved. Will be ok for perm occ once others go perm. Will also issue letter of completion for lease space once others perm.
BLD-Final11/1/200711/2/200711/2/2007AFAIL
DetailsMike Jordan
tim Phone #: ###-#### Note: please early morning to coordinate with. complete all fire caulking, Provide UL 3hr listed man door, provide 42"min guards at mezz, provide copy of final letter from special insp. agency and letter from engineer of record accepting non-conformances, Install hc sign at restroom at lease space.
FIRE-Final Inspection10/31/200711/1/200711/1/2007APASS
DetailsTroy Cobbley
Life safety passed. Fire station 11 called and stated the gate operated correctly.
FIRE-Final Inspection10/30/200710/31/200710/31/2007AFAIL
DetailsTroy Cobbley
See the job site correction notice for items needing correcting.
Code Occupancy Approval10/26/200710/26/200710/26/2007PPASS
DetailsScott M.Brown
OK FOR FINAL
BLD-Framing/Rough-in10/11/200710/12/200710/12/2007APART
DetailsMike Jordan
tim - ceiling grid - please call 1/2 hr prior to inspection Phone #: ###-####. Need reflected ceiling plan, spoke with architect, cisca 0-2 will be required.
FIRE-Conference10/10/200710/11/200710/11/2007ADONE
DetailsTroy Cobbley
I went over life safety requirements with the general contractor.
BLD-Framing/Rough-in9/13/20079/13/20079/13/2007PPASS
DetailsMike Jordan
jerod Phone #: ###-####. Drop plan mod. off.
BLD-Framing/Rough-in8/31/20079/4/20079/4/2007APART
DetailsMike Jordan
Jared; Phone #: ###-#### Internet Inspection Request from: Cathy WeisshauptAplan mod still needs to be submited to plan review for added shear walls for future mezz. Did note that contractor has faxed some engineering regarding shear wall attachment. All combustibles have been removed. Insul facing meets smoke and flame requirements and reviewed Ul specs for fire stop and reviewed special insp. reports.
BLD-Framing/Rough-in8/15/20078/16/20078/16/2007AFAIL
DetailsMike Jordan
Needs to resubmit plans to plan review for reflected changes in breakroom for future mezz. Noted type 2b const, no combustibles allowed. Non rated osb was used for shear walls for future mezz. Contractor to provide UL specs for thru penetrations and smoke and flame spread data for insul barrier at ceiling. Also noted were added shear wall was installed from floor elev. to 10ft is 1hr wall, utilizing 2 different UL designs on 1 wall? All other interior framed walls ok pending elec.
BLD-Framing/Rough-in8/15/20078/15/20078/15/2007PCANC
DetailsMike Jordan
Jared; Phone #: ###-#### Internet Inspection Request from: Hattie James. Canc. by contractor via. phone.
BLD-Framing/Rough-in7/18/20077/19/20077/19/2007APASS
DetailsMike Jordan
jared; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang. Reviewed special insp. reports. Inspected roof framing connections and reviewed plan items with contractor.
BLD-Other5/8/20075/9/20075/9/2007APART
DetailsMike Jordan
jerod -masonry wall, late morning; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. North masonry wall, 0 to 5' 4" elev. Masonry will have special insp.
BLD-Footing5/8/20075/9/20075/9/2007APASS
DetailsMike Jordan
jerod - late morning; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Additional column pad footings for added mezz. Footings as per RFI from engineer of record. Noted to contractor that a resubmittal would be necessary to plan review.
BLD-Concrete5/3/20075/4/20075/4/2007PPASS
DetailsMike Jordan
jared ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Remaining stemwall at sw corner of bldg.
BLD-Footing5/3/20075/3/20075/3/2007PPASS
DetailsMike Jordan
jared ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Remainder of perimeter footings at sw corner. Remaining column pad footings on south line.
BLD-Footing5/3/20075/4/20075/3/2007ACANC
DetailsMike Jordan
Jared; Phone #: ###-#### Internet Inspection Request from: Andrea Whiteman Inspection cancelled from web by: Patricia Smith
BLD-Footing5/2/20075/2/20075/2/2007PPART
DetailsMike Jordan
Jerad; Phone #: ###-#### Internet Inspection Request from: Andrea Whiteman. Interior colomn pad footings, south line. wip. east half complete and are ok. Still placing steel on remainder.
BLD-Footing4/27/20074/30/20074/30/2007PPART
DetailsMike Jordan
Jerad; Phone #: ###-#### Internet Inspection Request from: Andrea Whiteman. wip. Interior column pad footings, norht line. All stell tied and in place. Needs to lift top mat in place and clear sluff to maintain 3 inch clearance.
BLD-Concrete4/23/20074/24/20074/24/2007APASS
DetailsMike Jordan
jared ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. east, south stemwall.
BLD-Foundation4/20/20074/23/20074/23/2007APASS
DetailsMike Jordan
jerod Note: wall; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Perimeter stemwall, west and north sides. wip on south and east ends, majority of reinforcement is tied in place.
BLD-Foundation4/18/20074/19/20074/19/2007PPART
DetailsMike Jordan
gerad; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. wip. Al reinforcing steel tied in place. Forms for sstemwall were being placed when on site. Area of innspection is North stemwall only.
BLD-Footing4/17/20074/18/20074/18/2007APART
DetailsMike Jordan
Jared 10 Am if possible; Phone #: ###-#### Internet Inspection Request from: Stacie Backus. wip. South and west perimeter footings. Layout is complete, Needs to complete installation of verts only. ok to place concrete.
BLD-Footing4/13/20074/16/20074/16/2007PPASS
DetailsMike Jordan
jerod; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Permiter footings, north and west sides. Also noted that ufer was installed.