BLD-Final | 12/4/2007 | 12/5/2007 | 12/5/2007 | A | PASS |
Mike Jordan
|
|
|
tim Phone #: ###-####. Ok for perm occ. Letter of compliance was issued for space#104. Cathy, plm07-01301 should be a stand alone permit and not attached to this bld permit. This work is being done in the existing portion of the bldg. I contacted Lee Rice and left him ameesage to have this changed.
|
BLD-Final | 11/30/2007 | 12/3/2007 | 12/3/2007 | A | NR |
Mike Jordan
|
|
|
tim Note: please call 1/2 hr prior to inspections Phone #: ###-####
|
BLD-Final | 11/7/2007 | 11/7/2007 | 11/7/2007 | P | PART |
Mike Jordan
|
|
|
tim Note: call before inspection (not be available between 2-3) Phone #: ###-####. Temp occ granted. All isues resolved. Will be ok for perm occ once others go perm. Will also issue letter of completion for lease space once others perm.
|
BLD-Final | 11/1/2007 | 11/2/2007 | 11/2/2007 | A | FAIL |
Mike Jordan
|
|
|
tim Phone #: ###-#### Note: please early morning to coordinate with. complete all fire caulking, Provide UL 3hr listed man door, provide 42"min guards at mezz, provide copy of final letter from special insp. agency and letter from engineer of record accepting non-conformances, Install hc sign at restroom at lease space.
|
FIRE-Final Inspection | 10/31/2007 | 11/1/2007 | 11/1/2007 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Fire station 11 called and stated the gate operated correctly.
|
FIRE-Final Inspection | 10/30/2007 | 10/31/2007 | 10/31/2007 | A | FAIL |
Troy Cobbley
|
|
|
See the job site correction notice for items needing correcting.
|
Code Occupancy Approval | 10/26/2007 | 10/26/2007 | 10/26/2007 | P | PASS |
Scott M.Brown
|
|
|
OK FOR FINAL
|
BLD-Framing/Rough-in | 10/11/2007 | 10/12/2007 | 10/12/2007 | A | PART |
Mike Jordan
|
|
|
tim - ceiling grid - please call 1/2 hr prior to inspection Phone #: ###-####. Need reflected ceiling plan, spoke with architect, cisca 0-2 will be required.
|
FIRE-Conference | 10/10/2007 | 10/11/2007 | 10/11/2007 | A | DONE |
Troy Cobbley
|
|
|
I went over life safety requirements with the general contractor.
|
BLD-Framing/Rough-in | 9/13/2007 | 9/13/2007 | 9/13/2007 | P | PASS |
Mike Jordan
|
|
|
jerod Phone #: ###-####. Drop plan mod. off.
|
BLD-Framing/Rough-in | 8/31/2007 | 9/4/2007 | 9/4/2007 | A | PART |
Mike Jordan
|
|
|
Jared; Phone #: ###-#### Internet Inspection Request from: Cathy WeisshauptAplan mod still needs to be submited to plan review for added shear walls for future mezz. Did note that contractor has faxed some engineering regarding shear wall attachment. All combustibles have been removed. Insul facing meets smoke and flame requirements and reviewed Ul specs for fire stop and reviewed special insp. reports.
|
BLD-Framing/Rough-in | 8/15/2007 | 8/16/2007 | 8/16/2007 | A | FAIL |
Mike Jordan
|
|
|
Needs to resubmit plans to plan review for reflected changes in breakroom for future mezz. Noted type 2b const, no combustibles allowed. Non rated osb was used for shear walls for future mezz. Contractor to provide UL specs for thru penetrations and smoke and flame spread data for insul barrier at ceiling. Also noted were added shear wall was installed from floor elev. to 10ft is 1hr wall, utilizing 2 different UL designs on 1 wall? All other interior framed walls ok pending elec.
|
BLD-Framing/Rough-in | 8/15/2007 | 8/15/2007 | 8/15/2007 | P | CANC |
Mike Jordan
|
|
|
Jared; Phone #: ###-#### Internet Inspection Request from: Hattie James. Canc. by contractor via. phone.
|
BLD-Framing/Rough-in | 7/18/2007 | 7/19/2007 | 7/19/2007 | A | PASS |
Mike Jordan
|
|
|
jared; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang. Reviewed special insp. reports. Inspected roof framing connections and reviewed plan items with contractor.
|
BLD-Other | 5/8/2007 | 5/9/2007 | 5/9/2007 | A | PART |
Mike Jordan
|
|
|
jerod -masonry wall, late morning; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. North masonry wall, 0 to 5' 4" elev. Masonry will have special insp.
|
BLD-Footing | 5/8/2007 | 5/9/2007 | 5/9/2007 | A | PASS |
Mike Jordan
|
|
|
jerod - late morning; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Additional column pad footings for added mezz. Footings as per RFI from engineer of record. Noted to contractor that a resubmittal would be necessary to plan review.
|
BLD-Concrete | 5/3/2007 | 5/4/2007 | 5/4/2007 | P | PASS |
Mike Jordan
|
|
|
jared ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Remaining stemwall at sw corner of bldg.
|
BLD-Footing | 5/3/2007 | 5/3/2007 | 5/3/2007 | P | PASS |
Mike Jordan
|
|
|
jared ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Remainder of perimeter footings at sw corner. Remaining column pad footings on south line.
|
BLD-Footing | 5/3/2007 | 5/4/2007 | 5/3/2007 | A | CANC |
Mike Jordan
|
|
|
Jared; Phone #: ###-#### Internet Inspection Request from: Andrea Whiteman Inspection cancelled from web by: Patricia Smith
|
BLD-Footing | 5/2/2007 | 5/2/2007 | 5/2/2007 | P | PART |
Mike Jordan
|
|
|
Jerad; Phone #: ###-#### Internet Inspection Request from: Andrea Whiteman. Interior colomn pad footings, south line. wip. east half complete and are ok. Still placing steel on remainder.
|
BLD-Footing | 4/27/2007 | 4/30/2007 | 4/30/2007 | P | PART |
Mike Jordan
|
|
|
Jerad; Phone #: ###-#### Internet Inspection Request from: Andrea Whiteman. wip. Interior column pad footings, norht line. All stell tied and in place. Needs to lift top mat in place and clear sluff to maintain 3 inch clearance.
|
BLD-Concrete | 4/23/2007 | 4/24/2007 | 4/24/2007 | A | PASS |
Mike Jordan
|
|
|
jared ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. east, south stemwall.
|
BLD-Foundation | 4/20/2007 | 4/23/2007 | 4/23/2007 | A | PASS |
Mike Jordan
|
|
|
jerod Note: wall; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Perimeter stemwall, west and north sides. wip on south and east ends, majority of reinforcement is tied in place.
|
BLD-Foundation | 4/18/2007 | 4/19/2007 | 4/19/2007 | P | PART |
Mike Jordan
|
|
|
gerad; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. wip. Al reinforcing steel tied in place. Forms for sstemwall were being placed when on site. Area of innspection is North stemwall only.
|
BLD-Footing | 4/17/2007 | 4/18/2007 | 4/18/2007 | A | PART |
Mike Jordan
|
|
|
Jared 10 Am if possible; Phone #: ###-#### Internet Inspection Request from: Stacie Backus. wip. South and west perimeter footings. Layout is complete, Needs to complete installation of verts only. ok to place concrete.
|
BLD-Footing | 4/13/2007 | 4/16/2007 | 4/16/2007 | P | PASS |
Mike Jordan
|
|
|
jerod; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Permiter footings, north and west sides. Also noted that ufer was installed.
|