Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD06-02994
StatusFinaled
Name UNICO PROPERTIES
Site Address 101 S CAPITOL BLVD Unit: 600
Project NameUS BANK-6TH FLR
Customer Number 
ePlanReviewNo
Description
(NO CONTRACTOR REGISTRATION PROVIDED. APPLICANT CERTIFIES EXEMPTION PER IDAHO STATUTE 54-5205) (WACHOVIA SECURITIES - US BANK - SUITE 600) This building is fire sprinklered for high-rise. To expand a tenant space located on the 6th story of the US Bank Plaza by about 1,595 square feet. After the expansion, this tenant space will have a total floor area of about 4,263 square feet. The adjacent reduced tenant space will have a floor area of about 5,456 square feet. These spaces are located on the 6th story (14,600 square feet total) of an existing high rise building. The building "core" on this story has a floor area of about 2,670 square feet. Work is to include interior nonbearing walls, interior doors, interior windows, millwork, finishes, and alterations to a suspended ceiling. The fire sprinkler system, fire alarm system, and high-rise life safety systems (and the infrastructure supporting these systems) for the 6th story are required to comply with the provisions of the 2000 IBC. These existing systems, including the installation of quick-response fire sprinkler heads, were required to be upgraded in conjunction with permit BLD03-00539. The restrooms were also required to be upgraded to be accessible to the disabled under that permit. If not already existing, fire-safing shall be installed at the perimeter of the 6th story between the floor and the spandrel glass. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/6/20105/6/20105/6/2010PPASS
DetailsDave Hannah
BLD-Aging Inspection5/3/20105/3/20105/6/2010 PASS
DetailsDave Hannah
BLD-Final3/8/20073/8/20073/8/2007PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/8/2007 at 8:16:26 AM. Contact: ###-####. ok for perm occ
FIRE-Final Inspection3/5/20073/5/20073/6/2007PPASS
DetailsForrest France
Fire life safety finaled.
FIRE-Final Inspection3/1/20073/1/20073/1/2007PFAIL
DetailsForrest France
Life safety final pending satisfactory fire alarm testing.
BLD-Framing/Rough-in2/12/20072/12/20072/12/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/12/2007 at 6:27:08 AM. Contact: ###-####. ceiling grid ok to cover
BLD-Framing/Rough-in1/24/20071/24/20071/24/2007APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/24/2007 at 7:23:19 AM. Contact: ###-####.
BLD-Final1/8/20071/9/20071/10/2007PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/8/2007 at 3:52:49 PM. Contact: ###-####. ok to move into phase one
FIRE-Final Inspection1/8/20071/9/20071/9/2007APART
DetailsForrest France
Fire life safety for the south half of the remodel area is acceptable.
BLD-Final1/8/20071/8/20071/8/2007PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/8/2007 at 7:47:58 AM. Contact: ###-####.
BLD-Framing/Rough-in1/3/20071/3/20071/3/2007PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/3/2007 at 7:50:55 AM. Contact: ###-####.
BLD-Framing/Rough-in12/6/200612/6/200612/7/2006PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/6/2006 at 7:31:43 AM. Contact: ###-####.