BLD-Final | 4/1/2008 | 4/1/2008 | 4/1/2008 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 4/1/2008 | 4/1/2008 | 4/1/2008 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 2/28/2007 | 2/28/2007 | 2/28/2007 | P | PASS |
Mike Jordan
|
|
|
Greg; Phone #: ###-#### Internet Inspection Request from: Stacie Backus. ok for final. All work done as per the approved engineering.
|
BLD-Final | 2/12/2007 | 2/13/2007 | 2/13/2007 | A | FAIL |
Mike Jordan
|
|
|
greg; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Racks not anchored to conc. floor as per engineering. Contractor to contact engineer for possible change or complete work as per supplied engineering.
|
FIRE-Final Inspection | 2/12/2007 | 2/12/2007 | 2/12/2007 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Final Inspection | 12/28/2006 | 12/29/2006 | 12/29/2006 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with dave hannimans permission until the fire sprinkler/aisles are discussed. Signs for maximum storage need to be installed.
|