Permanent Occupancy | | 1/25/2007 | 1/25/2007 | | DONE |
|
|
|
|
Permanent Occupancy | | 1/25/2007 | 1/25/2007 | | DONE |
|
|
|
|
BLD-Final | 1/23/2007 | 1/24/2007 | 1/24/2007 | A | PASS |
Tom Arcoraci
|
|
|
All finaled- CDHD is on TCO pending operational inspection. Coffee is on. Thank you. Phone #: ###-####
|
FIRE-Final Inspection | 1/22/2007 | 1/22/2007 | 1/22/2007 | P | PASS |
Troy Cobbley
|
|
|
life safety finaled
|
BLD-Other | 1/10/2007 | 1/10/2007 | 1/10/2007 | P | PASS |
Jim Sly
|
|
|
john note: ceiling inspection; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
FIRE-Alarm Testing | 1/10/2007 | 1/10/2007 | 1/10/2007 | P | PASS |
Troy Cobbley
|
|
|
The duct smoke detectors operated correctly.
|
BLD-Wall cover | 12/13/2006 | 12/13/2006 | 12/13/2006 | P | PASS |
Jim Sly
|
|
|
John Note: it ’’’’s fpr the soffits; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett Frame ok
|
BLD-Framing/Rough-in | 12/11/2006 | 12/11/2006 | 12/11/2006 | P | PASS |
Jim Sly
|
|
|
john//wall cover; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt
|