Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD06-03022
StatusFinaled
Name PROGRESSIVE PROPERTIES
Site Address 2111 S PHILLIPPI ST
Project Name 
Customer Number 
ePlanReviewNo
Description
"CONTRACTOR RODGER SMITH REGISTRATION NUMBER RCE-6464" To construct a 2146sq.ft. Two story single family dwelling (1132sq.ft. Main level / 1014sq.ft. Upper level) with a 68sq.ft. Covered front porch, a 156sq.ft. Covered rear patio, and a 788sq.ft. Attached garage per approved plans, all red-lining, and Plan review report. THE PERMIT HOLDER is responsible to comply with current wall bracing requirements adopted by the city of Boise. R-1C zoning district, CZC06-156, and building setbacks as per Sue Hansen with Planning and Zoning. (SRZ)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/14/20075/15/20075/15/2007APASS
DetailsTom Arcoraci
roger ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
DOC - Permit Finaled5/15/20075/15/20075/15/2007PPASS
DetailsTom Arcoraci
Code Occupancy Approval5/14/20075/14/20075/14/2007PPASS
DetailsDena Gambrel
5-14-07 passed. The two "no parking" signs have been installed.
Code Occupancy Approval5/11/20075/11/20075/11/2007PFAIL
DetailsDena Gambrel
5-11-07 Not sure what CE is to be looking at. CZC06-156 was already finaled. Upon my inspection though the two "no parking" signs were not there.
BLD-Final5/3/20075/3/20075/3/2007PNR
DetailsTom Arcoraci
roger; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Energy code compliance1/25/20071/26/20071/26/2007APASS
DetailsJim Sly
roger; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Framing/Rough-in1/25/20071/26/20071/26/2007APASS
DetailsJim Sly
roger; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Framing/Rough-in1/22/20071/22/20071/22/2007PPART
DetailsJim Storey
ROGER; Phone #: ###-#### Internet Inspection Request from: Victoria Beall need truss bracing and headers east closets bearing point for vaulted trusses. ok to insulate.
BLD-Foundation12/1/200612/4/200612/4/2006APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/1/2006 at 10:42:49 AM. Contact: ###-####.
BLD-Foundation11/30/200612/1/200612/1/2006PCANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 11/30/2006 at 7:15:33 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Dec 1 2006 10:48AM.
BLD-Footing11/30/200611/30/200611/30/2006PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 11/30/2006 at 7:14:37 AM. Contact: ###-####.