Permit Number | BLD06-03246 |
Status | Finaled |
Name |
BROOKE VIEW HOMES
|
Site Address |
421 S CURTIS RD Unit: 69
|
Project Name | |
Customer Number | |
ePlanReview | No |
Description |
(Brook View, Diane Miller RCE-9561) To place a new enhanced manufactured dwelling on 182l.f. of new foundation wall along with an 816s.f. fully self supporting 3-car garage attached. R-2 Setbacks to meet the requirements of the Boise City Zoning Ordinance and policy by H. Wayne Gibbs. Setbacks of this unit to maintain 6 ft. from other units measured from wall or other roof support elements, and a minimum of 4 ft. eave line separation per Sue Hansen. Documents pertaining to tie down requirements must be at jobsite at the time of inspections. Inspections are required prior to placing of concrete. Manufacturer approved overbuild documents must be at on the jobsite at the time of framing inspection of the attached garage. A separate electrical, plumbing and ESC permits will also be required. All per the approved plans as marked and plan review notes. pep
|