BLD-Final | 12/12/2007 | 12/13/2007 | 12/13/2007 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/12/2007 at 10:24:17 AM. Contact: ###-####. ok for perm occ
|
BLD-Final | 7/12/2007 | 7/13/2007 | 7/13/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/12/2007 at 3:57:30 PM. Contact: ###-####. ok for temp occ ok for perm after shell is passed
|
BLD-Final | 7/10/2007 | 7/11/2007 | 7/12/2007 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/10/2007 at 11:50:46 AM. Contact: ###-####.
|
FIRE-Final Inspection | 7/6/2007 | 7/9/2007 | 7/10/2007 | P | PASS |
Forrest France
|
|
|
TI fire life safety inspection completed satisfactory.
|
BLD-Framing/Rough-in | 6/7/2007 | 6/8/2007 | 6/8/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/7/2007 at 11:50:00 AM. Contact: ###-####. ok to cover ceiling
|
BLD-Framing/Rough-in | 6/5/2007 | 6/6/2007 | 6/6/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/5/2007 at 1:42:27 PM. Contact: ###-####. ceiling grid ok but needs to patch fire proofing
|
BLD-Framing/Rough-in | 5/16/2007 | 5/17/2007 | 5/17/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/16/2007 at 1:25:01 PM. Contact: ###-####. ceiling grid 2nd floor ok to cover after fire sprinkler r/i is done
|
BLD-Framing/Rough-in | 4/2/2007 | 4/3/2007 | 4/3/2007 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/2/2007 at 3:25:20 PM. Contact: ###-####. ok to cover ceiling of drive area and second floor int wall framing
|
BLD-Framing/Rough-in | 3/8/2007 | 3/9/2007 | 3/9/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/8/2007 at 12:15:44 PM. Contact: ###-####. first floor framing ok to cover
|