BLD-Final | 12/12/2007 | 12/12/2007 | 12/13/2007 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/12/2007 at 11:05:13 AM. Contact: ###-####. ok for perm occ
|
FIRE-Final Inspection | 12/11/2007 | 12/12/2007 | 12/12/2007 | A | PASS |
Forrest France
|
|
|
One missing PFE installed while on site, fire life safety passed.
|
FIRE-Sprinkler Rough-in | 7/24/2007 | 7/24/2007 | 7/24/2007 | A | PART |
Forrest France
|
|
|
See fire sprinkler plans for areas approved for ceiling cover.
|
BLD-Framing/Rough-in | 7/20/2007 | 7/23/2007 | 7/23/2007 | A | PART |
Dave Hannah
|
|
|
don - ceiling grid; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang OK TO COVER AFTER OTHER TRADES OK
|
BLD-Framing/Rough-in | 6/28/2007 | 6/29/2007 | 6/29/2007 | A | PASS |
Tom Arcoraci
|
|
|
don; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
|
FIRE-Sprinkler Rough-in | 4/30/2007 | 5/1/2007 | 5/1/2007 | A | DEFR |
Forrest France
|
|
|
Inspection was intended for the project related fire sprinkler permit work.
|
BLD-Other | 4/30/2007 | 5/1/2007 | 5/1/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/30/2007 at 8:36:17 AM. Contact: ###-####. ceiling grid ok to cover after other trades sign off
|
BLD-Framing/Rough-in | 4/5/2007 | 4/6/2007 | 4/6/2007 | A | DONE |
Dave Hannah
|
|
|
don ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Framing/Rough-in | 4/6/2007 | 4/6/2007 | 4/6/2007 | P | PART |
Dave Hannah
|
|
|
don ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok to cover walls inne corner of floor after elec r/i inspection is passed
|
BLD-Framing/Rough-in | 1/25/2007 | 1/26/2007 | 1/26/2007 | A | PART |
Dave Hannah
|
|
|
Don, call 1st; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ph 2 ceiling grid ok after mec r/i
|
BLD-Conference | 1/25/2007 | 1/25/2007 | 1/26/2007 | P | DEFR |
Dave Hannah
|
|
|
Don, call 1st; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
FIRE-Conference | 12/20/2006 | 12/20/2006 | 12/21/2006 | P | DONE |
Forrest France
|
|
|
|
BLD-Framing/Rough-in | 12/20/2006 | 12/20/2006 | 12/20/2006 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/20/2006 at 9:21:25 AM. Contact: ###-####. storage room ok to cover walls
|