BLD-Framing/Rough-in | 1/12/2007 | 1/12/2007 | 1/12/2007 | P | PASS |
Dave Hannah
|
|
|
bill - late afternoon; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Final | 1/12/2007 | 1/12/2007 | 1/12/2007 | P | PASS |
Dave Hannah
|
|
|
bill - late afternoon; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok for p[erm occ
|
FIRE-Final Inspection | 1/11/2007 | 1/12/2007 | 1/12/2007 | A | PASS |
Forrest France
|
|
|
Items on previous c/n have been completed, the provided PFE's are to be tagged prior to structural final as discussed, inspection passed.
|
BLD-Final | 1/11/2007 | 1/12/2007 | 1/12/2007 | A | DEFR |
Dave Hannah
|
|
|
bill - late afternoon; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
Permanent Occupancy | | 1/12/2007 | 1/12/2007 | | DONE |
|
|
|
|
BLD-Final | 1/9/2007 | 1/10/2007 | 1/10/2007 | A | NR |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Victoria Beall needs fire finals
|
FIRE-Final Inspection | 1/9/2007 | 1/9/2007 | 1/9/2007 | P | FAIL |
Forrest France
|
|
|
Need to provide exit signs/emergency lights at two locations as indicated on approved plan set sheet A2.1, also need to provide one 2A10BC extinguisher per floor level with current certification tag, remove the tape covering the SW sprinkler head at the skylight in the basement.
|